Weston Lakes, TX Permit Fees (2026)
Building permit fees and building and roofing permit fees for Weston Lakes, straight from the official fee schedule, with a free permit fee calculator below.
Weston Lakes has no building-code, electrical, plumbing or mechanical permit. Its only construction permit is the floodplain development permit: $65 outside the floodplain or $105 inside it, plus a $40 engineer review fee, both included in this estimate. The City Engineer's actual cost is billed on top and is not included, and the city says the fee for work in the flood zone is set when the permit is issued. The permit amounts date from 2011, and the city has posted no vote reauthorizing them under the state's ten-year rule for building permit fees (Local Government Code 214.908).
In Weston Lakes, a building permit for a $50,000 remodel runs $105.00 in permit fees, and a $20,000 re-roof $105.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Weston Lakes Schedule of Fees as of 2021 (Flood Plain Permit and Engineer Review fees)
Covers building and roofing permits.
Call the building department at (281) 533-0907.
Last verified: November 3, 2026
Weston Lakes Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Weston Lakes
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Weston Lakes building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageWeston Lakes Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Weston Lakes are the same either way.
2 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Weston Lakes has no building-code, electrical, plumbing or mechanical permit. Its only construction permit is the floodplain development permit: $65 outside the floodplain or $105 inside it, plus a $40 engineer review fee, both included in this estimate. The City Engineer's actual cost is billed on top and is not included, and the city says the fee for work in the flood zone is set when the permit is issued. The permit amounts date from 2011, and the city has posted no vote reauthorizing them under the state's ten-year rule for building permit fees (Local Government Code 214.908).
Estimate only. Confirm with the Weston Lakes building department before applying. Phone: (281) 533-0907. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Weston Lakes building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Weston Lakes
The City of Weston Lakes issues one construction permit, the Development Permit/Flood Plain Permit, which it requires for all structures and buildings built in the city. Submit the permit application with a site plan and a survey plat showing where the building sits on the lot, in person at City Hall, 8045 FM 359, Suite 200, Fulshear, on Mondays and Wednesdays from 11 AM to 5 PM, or by email to citysec@westonlakestexas.gov. There is no online permit portal. Work in or near the flood zone also needs a pre-construction elevation certificate, and a post-construction elevation certificate once the structure is complete. The City's Flood Plain Administrator reviews each application, so allow time for review. Inside the gated Weston Lakes community the Architectural Control Committee must also approve the work; the city permit is issued first. The permit fee is collected when the permit is issued, and construction may not begin until then.
Source: Weston Lakes application instructions
- Phone
- (281) 533-0907
- Address
- 8045 FM 359, Suite 200, Fulshear, TX 77441 (mail: P.O. Box 1082, Fulshear, TX 77441)
- Hours
- Mondays and Wednesdays, 11 AM to 5 PM
- Source
- Official contact page
Weston Lakes Permit Fee FAQs
How Much Does a Building Permit Cost in Weston Lakes?
How Much Does a Roofing Permit Cost in Weston Lakes?
How Are Permit Fees Calculated in Weston Lakes?
Where Do These Fees Come From?
Other Jurisdictions in Fort Bend County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.