FreeEvery fee straight from the official city and county fee schedules. No signup.

Boca Raton, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Boca Raton, straight from the official fee schedule, with a free permit fee calculator below.

In Boca Raton, a building permit for a $50,000 remodel runs $1,261.80 in permit fees, a $20,000 re-roof $422.30, a $10,000 HVAC change-out $258.30, a $10,000 electrical panel upgrade or rewire $258.30, and a $10,000 whole-house repipe $258.30. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Boca Raton Municipal Facilities and Services User Fee Schedule (effective 10/1/2025, Resolution No. 162-2025), Section I.C Building Permits

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Boca Raton values a job: Fees are based on the total estimated valuation of construction costs (the total contract amount), excluding flooring material costs; a complete copy of the construction contract may be required.

Schedule effective October 1, 2025. Last verified: September 11, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Boca Raton Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Boca Raton

All projects
tiered rates (see fee table)
$0–$500
$100.00
Over $500
$100.00 + $16.00 per $1,000
Private provider inspection
tiered rates (see fee table)
$0–$500
$100.00
Over $500
$100.00 + $14.50 per $1,000
Private provider plan review + inspection
tiered rates (see fee table)
$0–$500
$100.00
Over $500
$100.00 + $13.00 per $1,000
FL Statutory Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Statutory Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Hardship Extension - 1st Extension (if applicable)
$122.00
Hardship Extension - 2nd Extension (if applicable)
$607.00
Hardship Extension - 3rd Extension (if applicable)
$1,213.00
Initial Permit Processing Deposit (credited toward permit fee)
1% of job value, minimum $100.00
Inspection for CO in Existing Building (Change of Occupancy Classification) (if applicable)
$105.00
Modification of Temporary Certificate of Occupancy (if applicable)
$1,500.00
Partial Inspection Fee (if applicable)
$79.00
Permit Reapplication (expired) (if applicable)
100% of the permit fee, maximum $182.00
Permit Renewal (expired, one-time by Building Official) (if applicable)
100% of the permit fee, maximum $182.00
Pre-Permit Construction Agreement (if applicable)
0.5% of job value, minimum $750.00, maximum $3,948.00
Re-inspection Fee (if applicable)
$79.00
TCO Extension - 1st Extension (if applicable)
1% of job value, minimum $3,000.00, maximum $8,000.00
TCO Extension - 2nd Extension (if applicable)
1% of job value, minimum $5,000.00, maximum $15,000.00
TCO Extension - 3rd Extension (if applicable)
1% of job value, minimum $10,000.00, maximum $25,000.00
TCO Extension - 4th and All Subsequent Extensions (if applicable)
1% of job value, minimum $25,000.00, maximum $50,000.00
Temporary Certificate of Occupancy (if applicable)
1% of job value, minimum $1,500.00, maximum $3,948.00
Transfer of Permit (Change of Contractor) (if applicable)
$125.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Boca Raton

Homeowners and contractors planning a project check Boca Raton mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Boca Raton Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Boca Raton are the same either way.

Kind of work

Fees in Boca Raton are the same either way.

Rate type
$
$500$50,000
Estimated mechanical / HVAC permit fee
$258.30
Mechanical / HVAC permit fee$252.00
tiered rates (see fee table)
FL Statutory Surcharge (F.S. 468.631)$3.78
FL Statutory Surcharge (F.S. 553.721)$2.52
Initial Permit Processing Deposit (not added to total)$100.00
Paid up front; credited against the final permit fee.
Total Estimate$258.30

Fees are based on the total estimated valuation of construction costs (the total contract amount), excluding flooring material costs; a complete copy of the construction contract may be required.

Estimate only. Confirm with the Boca Raton building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Boca Raton

Homeowners and contractors planning a project check Boca Raton mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Boca Raton Permit Fee FAQs

How Much Does a Building Permit Cost in Boca Raton?

The building permit for a $50,000 residential remodel runs $1,261.80, including the documented surcharges and minimum fees. The estimate is built from Boca Raton's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Boca Raton?

The roofing permit for a $20,000 residential re-roof runs $422.30, based on Boca Raton's sourced fee schedule.

How Are Permit Fees Calculated in Boca Raton?

A residential building permit is tiered rates (see fee table). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Boca Raton?

On top of the base permit fee, the sourced schedule adds FL Statutory Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and FL Statutory Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Boca Raton?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Boca Raton Municipal Facilities and Services User Fee Schedule (effective 10/1/2025, Resolution No. 162-2025), Section I.C Building Permits. See the official schedule. Last verified .

Other Jurisdictions in Palm Beach County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.