Gulf Stream, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Gulf Stream, straight from the official fee schedule, with a free permit fee calculator below.
Building permits for Gulf Stream are issued and inspected by the Town of Highland Beach under Gulf Stream Town Code Sec. 42-27; Gulf Stream separately charges its own building permit review fee shown below. See the Highland Beach fee schedule
Building permits for Gulf Stream are issued by the Town of Highland Beach, whose current fee schedule is in force through September 30, 2026. Highland Beach is expected to adopt a new schedule for the fiscal year beginning October 1, 2026; figures here will be updated when it is published. See the official notice
In Gulf Stream, a building permit for a $50,000 remodel runs $1,587.50 in permit fees, a $20,000 re-roof $636.00, a $10,000 HVAC change-out $350.50, a $10,000 electrical panel upgrade or rewire $350.50, and a $10,000 whole-house repipe $350.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Resolution No. 2026-008, Exhibit B: Town of Highland Beach Building and Land Development Schedule of Fees, revised effective 07/01/2026-09/30/2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.
Building permits for Gulf Stream are issued and inspected by the Town of Highland Beach under Gulf Stream Town Code Sec. 42-27; Gulf Stream separately charges its own building permit review fee shown below. See the Highland Beach fee schedule
How Gulf Stream values a job: Building permit fees are based on the value of the work as determined under Section 109 of the Town's Administrative Amendments to the Florida Building Code.
Schedule effective July 1, 2026. Last verified: September 12, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Gulf Stream Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Gulf Stream
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Gulf Stream electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGulf Stream Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Gulf Stream are the same either way.
Fees in Gulf Stream are the same either way.
Building permit fees are based on the value of the work as determined under Section 109 of the Town's Administrative Amendments to the Florida Building Code.
Permit fees for Gulf Stream are administered by Highland Beach; the fees shown are the Highland Beach schedule.
Building permits for Gulf Stream are issued by the Town of Highland Beach, whose current fee schedule is in force through September 30, 2026. Highland Beach is expected to adopt a new schedule for the fiscal year beginning October 1, 2026; figures here will be updated when it is published. See the official notice
Estimate only. Confirm with the Highland Beach building department before applying.
Homeowners and contractors planning a project check Gulf Stream electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGulf Stream Permit Fee FAQs
How Much Does a Building Permit Cost in Gulf Stream?
How Much Does a Roofing Permit Cost in Gulf Stream?
How Are Permit Fees Calculated in Gulf Stream?
What Is the Minimum Permit Fee in Gulf Stream?
What Surcharges Are Added to Permits in Gulf Stream?
Do I Need a Permit for a Small Residential Job in Gulf Stream?
Where Do These Fees Come From?
Other Jurisdictions in Palm Beach County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.