Gulf Stream, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Gulf Stream, straight from the official fee schedule, with a free permit fee calculator below.

Building permits for Gulf Stream are issued and inspected by the Town of Highland Beach under Gulf Stream Town Code Sec. 42-27; Gulf Stream separately charges its own building permit review fee shown below. See the Highland Beach fee schedule

Building permits for Gulf Stream are issued by the Town of Highland Beach, whose current fee schedule is in force through September 30, 2026. Highland Beach is expected to adopt a new schedule for the fiscal year beginning October 1, 2026; figures here will be updated when it is published. See the official notice

In Gulf Stream, a building permit for a $50,000 remodel runs $1,587.50 in permit fees, a $20,000 re-roof $636.00, a $10,000 HVAC change-out $350.50, a $10,000 electrical panel upgrade or rewire $350.50, and a $10,000 whole-house repipe $350.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution No. 2026-008, Exhibit B: Town of Highland Beach Building and Land Development Schedule of Fees, revised effective 07/01/2026-09/30/2026

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.

Building permits for Gulf Stream are issued and inspected by the Town of Highland Beach under Gulf Stream Town Code Sec. 42-27; Gulf Stream separately charges its own building permit review fee shown below. See the Highland Beach fee schedule

How Gulf Stream values a job: Building permit fees are based on the value of the work as determined under Section 109 of the Town's Administrative Amendments to the Florida Building Code.

Schedule effective July 1, 2026. Last verified: September 12, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Gulf Stream Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Gulf Stream

All projects
tiered rates (see fee table) (Tier 2 Band Base Fee ($11,000) equals 500 increments times $22.00, reproducing the printed $22.00 per $1,000 rate through $500,000 before the $17.50 per $1,000 rate applies above that threshold.)
$0–$500,000
$22.00 per $1,000
Over $500,000
$11,000.00 + $17.50 per $1,000
Additional Plan Review Fee (per page)
$50.00 per page
FL State Surcharge - BCAIF (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL State Surcharge - FBC (F.S. 553.721)
1% of the permit fee, minimum $2.00
Gulf Stream Town Zoning and Design Review Fee
tiered by job value
$0–$4,999
$85.00
$4,999–$9,999
$110.00
$9,999–$14,999
$125.00
$14,999–$19,999
$150.00
$19,999–$24,999
$185.00
$24,999–$29,999
$200.00
$29,999–$39,999
$260.00
$39,999–$49,999
$335.00
$49,999–$69,999
$460.00
$69,999–$99,999
$585.00
$99,999–$149,999
$750.00
$149,999–$199,999
$1,000.00
$199,999–$399,999
$1,170.00
$399,999–$649,999
$1,625.00
$649,999–$999,999
$1,835.00
$999,999–$1,499,999
$3,000.00
$1,499,999–$1,999,999
$3,670.00
$1,999,999–$2,499,999
$4,170.00
$2,499,999–$2,999,999
$4,670.00
$2,999,999–$3,499,999
$5,170.00
$3,499,999–$3,999,999
$5,670.00
$3,999,999–$4,499,999
$6,170.00
$4,499,999–$4,999,999
$6,670.00
$4,999,999–$7,499,999
$7,500.00
Over $7,499,999
$7,500.00 + $1.00 per $1,000
Private Provider Reduction - Full (Inspections and Plan Review) (with a private provider for plan review and inspections)
may reduce the permit fee by 26%
Private Provider Reduction - Inspections Only (with a private provider for inspections)
may reduce the permit fee by 13%
Private Provider Reduction - Plan Review Only (with a private provider for plan review)
may reduce the permit fee by 13%
Reinspection Fee
$100.00 per inspection
Appeal of Building Code Decision Fee (if applicable)
$1,500.00
Change in Contractor Fee (if applicable)
$50.00
Expired Permit Reinstatement Fee (if applicable)
$250.00
Fire sprinkler permit fee (if applicable)
$100.00
Gulf Stream Plan Revision or Permit Renewal Fee (if applicable)
$50.00
Permit Extension Fee (if applicable)
$100.00
Portable Storage Unit Permit Fee (if applicable)
$50.00
Remote Video Inspection Fee (RVI) (if applicable)
$20.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Gulf Stream

Homeowners and contractors planning a project check Gulf Stream roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Gulf Stream Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Gulf Stream are the same either way.

Kind of work

Fees in Gulf Stream are the same either way.

$
$500$100,000
Estimated roofing permit fee
$636.00
Roofing permit fee$440.00
tiered rates (see fee table) (Tier 2 Band Base Fee ($11,000) equals 500 increments times $22.00, reproducing the printed $22.00 per $1,000 rate through $500,000 before the $17.50 per $1,000 rate applies above that threshold.)
Additional Plan Review Fee (per page)$50.00 / page
Charged per page; not included in this total, as it depends on your project's unit count.
FL State Surcharge - BCAIF (F.S. 468.631)$6.60
FL State Surcharge - FBC (F.S. 553.721)$4.40
Gulf Stream Town Zoning and Design Review Fee$185.00
Private Provider Reduction - Full (Inspections and Plan Review)26% of the permit fee
Not applied. Hiring a licensed private provider for plan review and inspections (s. 553.791) may reduce this fee per the printed schedule; the provider's own fees are separate. Confirm eligibility and the reduced figure with the building department.
Private Provider Reduction - Inspections Only13% of the permit fee
Not applied. Hiring a licensed private provider for inspections (s. 553.791) may reduce this fee per the printed schedule; the provider's own fees are separate. Confirm eligibility and the reduced figure with the building department.
Private Provider Reduction - Plan Review Only13% of the permit fee
Not applied. Hiring a licensed private provider for plan review (s. 553.791) may reduce this fee per the printed schedule; the provider's own fees are separate. Confirm eligibility and the reduced figure with the building department.
Reinspection Fee$100.00 / inspection
Charged per inspection; not included in this total, as it depends on your project's unit count.
Total Estimate$636.00

Building permit fees are based on the value of the work as determined under Section 109 of the Town's Administrative Amendments to the Florida Building Code.

Permit fees for Gulf Stream are administered by Highland Beach; the fees shown are the Highland Beach schedule.

Building permits for Gulf Stream are issued by the Town of Highland Beach, whose current fee schedule is in force through September 30, 2026. Highland Beach is expected to adopt a new schedule for the fiscal year beginning October 1, 2026; figures here will be updated when it is published. See the official notice

Estimate only. Confirm with the Highland Beach building department before applying.

Sponsor This Page
Be the Featured Roofer in Gulf Stream

Homeowners and contractors planning a project check Gulf Stream roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Gulf Stream Permit Fee FAQs

How Much Does a Building Permit Cost in Gulf Stream?

The building permit for a $50,000 residential remodel runs $1,587.50, including the documented surcharges and minimum fees. The estimate is built from Gulf Stream's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Gulf Stream?

The roofing permit for a $20,000 residential re-roof runs $636.00, based on Gulf Stream's sourced fee schedule.

How Are Permit Fees Calculated in Gulf Stream?

A residential building permit is tiered rates (see fee table) (Tier 2 Band Base Fee ($11,000) equals 500 increments times $22.00, reproducing the printed $22.00 per $1,000 rate through $500,000 before the $17.50 per $1,000 rate applies above that threshold.). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Gulf Stream?

The sourced schedule sets a minimum permit fee of $100.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Gulf Stream?

On top of the base permit fee, the sourced schedule adds FL State Surcharge - BCAIF (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), FL State Surcharge - FBC (F.S. 553.721) (1% of the permit fee, minimum $2.00), Private Provider Reduction - Full (Inspections and Plan Review) (may reduce the permit fee by 26%), Private Provider Reduction - Inspections Only (may reduce the permit fee by 13%) and Private Provider Reduction - Plan Review Only (may reduce the permit fee by 13%). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Gulf Stream?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution No. 2026-008, Exhibit B: Town of Highland Beach Building and Land Development Schedule of Fees, revised effective 07/01/2026-09/30/2026. See the official schedule. Last verified .

Other Jurisdictions in Palm Beach County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.