FreeEvery fee straight from the official city and county fee schedules. No signup.

Lake Park, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Lake Park, straight from the official fee schedule, with a free permit fee calculator below.

Under Florida HB 803, minor single family home work valued under $7,500 may not require a permit at all in Lake Park. Electrical, plumbing, mechanical, gas, structural and roofing work, and any work in a flood hazard area, still requires a permit. The Town requires a written exemption request before work begins. See the official notice

In Lake Park, a building permit for a $50,000 remodel runs $1,127.50 in permit fees, a $20,000 re-roof $512.50, a $10,000 HVAC change-out $307.50, a $10,000 electrical panel upgrade or rewire $307.50, and a $10,000 whole-house repipe $307.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Lake Park Master Fee Schedule 2025, Exhibit A to Resolution 60-09-25 (Community Development - Building Permit Fees)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.

Schedule effective September 3, 2025. Last verified: September 12, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Lake Park Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Lake Park

All projects
tiered rates (see fee table)
$0–$2,499
$100.00
$2,499–$999,999
$149.98 + $20.00 per $1,000
Over $999,999
$12,599.99 + $12.50 per $1,000
FL Building Code Admin Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Additional Inspection Fee (if applicable)
$40.00
Permit Renewal/Reissuance Administrative Fee (if applicable)
$60.00
Permit Revision Administrative Fee (if applicable)
$50.00
Re-inspection Fee (if applicable)
$75.00
Sub-Permit Administrative Fee (if applicable)
$50.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Lake Park

Homeowners and contractors planning a project check Lake Park electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lake Park Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Lake Park are the same either way.

Kind of work

Fees in Lake Park are the same either way.

$
$500$100,000
Estimated electrical permit fee
$307.50
Electrical permit fee$300.00
tiered rates (see fee table)
FL Building Code Admin Surcharge (F.S. 468.631)$4.50
FL Building Permit Surcharge (F.S. 553.721)$3.00
Total Estimate$307.50

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Under Florida HB 803, minor single family home work valued under $7,500 may not require a permit at all in Lake Park. Electrical, plumbing, mechanical, gas, structural and roofing work, and any work in a flood hazard area, still requires a permit. The Town requires a written exemption request before work begins. See the official notice

Estimate only. Confirm with the Lake Park building department before applying.

Sponsor This Page
Be the Featured Electrician in Lake Park

Homeowners and contractors planning a project check Lake Park electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lake Park Permit Fee FAQs

How Much Does a Building Permit Cost in Lake Park?

The building permit for a $50,000 residential remodel runs $1,127.50, including the documented surcharges and minimum fees. The estimate is built from Lake Park's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Lake Park?

The roofing permit for a $20,000 residential re-roof runs $512.50, based on Lake Park's sourced fee schedule.

How Are Permit Fees Calculated in Lake Park?

A residential building permit is tiered rates (see fee table). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Lake Park?

The sourced schedule sets a minimum permit fee of $100.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Lake Park?

On top of the base permit fee, the sourced schedule adds FL Building Code Admin Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and FL Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Lake Park?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Lake Park Master Fee Schedule 2025, Exhibit A to Resolution 60-09-25 (Community Development - Building Permit Fees). See the official schedule. Last verified .

Other Jurisdictions in Palm Beach County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.