Tequesta, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Tequesta, straight from the official fee schedule, with a free permit fee calculator below.
Tequesta replaced its building permit fees with Resolution 10-26 on June 29, 2026; the Village's posted Master Fee Schedule still shows the older rates, and this page follows the adopted resolution. Fire Rescue plan review rates shown take effect October 1, 2026. Estimates include a 1% zoning review fee that may not apply to every job; confirm with the Village. See the official notice
In Tequesta, a building permit for a $50,000 remodel runs $1,687.13 in permit fees, a $20,000 re-roof $519.85, a $10,000 electrical panel upgrade or rewire $327.61, and a $10,000 whole-house repipe $297.43. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorVillage of Tequesta Resolution No. 10-26, Exhibit A: Appendix C Permit Fees (adopted June 29, 2026 to implement HB 803)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Tequesta values a job: For new construction and additions, Tequesta sets permit valuation from gross square footage times the current ICC Building Valuation Data cost per square foot (Florida Building Code Section 109.3.4); for remodel, trade, and roofing work the Building Official sets the valuation. This estimate applies the rate to the job value you enter, so if your contract price exceeds the ICC table value the actual fee will be lower.
Schedule effective June 29, 2026. Last verified: September 28, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Tequesta Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Tequesta
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Tequesta electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageTequesta Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
8 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Tequesta replaced its building permit fees with Resolution 10-26 on June 29, 2026; the Village's posted Master Fee Schedule still shows the older rates, and this page follows the adopted resolution. Fire Rescue plan review rates shown take effect October 1, 2026. Estimates include a 1% zoning review fee that may not apply to every job; confirm with the Village. See the official notice
Estimate only. Confirm with the Tequesta building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Tequesta electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageTequesta Permit Fee FAQs
How Much Does a Building Permit Cost in Tequesta?
How Much Does a Roofing Permit Cost in Tequesta?
How Are Permit Fees Calculated in Tequesta?
What Surcharges Are Added to Permits in Tequesta?
Do I Need a Permit for a Small Residential Job in Tequesta?
Where Do These Fees Come From?
Other Jurisdictions in Palm Beach County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.