Building Permit Fees in Dunedin, FL (2026)
In Dunedin, a building permit for a $50,000 remodel runs $510.00 in permit fees, a $20,000 re-roof $204.40, a $10,000 HVAC change-out $124.00, a $10,000 electrical panel upgrade or rewire $124.00, and a $10,000 whole-house repipe $124.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Dunedin Code of Ordinances, Appendix C - Development Charges & Impact Fees (Ord. No. 15-33 Exhibit A as amended; codified through Ord. No. 24-23, adopted 9-5-2024; Municode Supp. 48, current through Ord. No. 26-01, 3-19-2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $60.00.
How Dunedin values a job: Construction valuation is based on the most current ICC Building Valuation Data or an actual signed construction contract, calculated on the gross area of the building for new construction (or the work area for alterations and renovations).
Schedule effective September 5, 2024. Last verified: August 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Dunedin Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Dunedin
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Dunedin plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDunedin Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Dunedin are the same either way.
Fees in Dunedin are the same either way.
Construction valuation is based on the most current ICC Building Valuation Data or an actual signed construction contract, calculated on the gross area of the building for new construction (or the work area for alterations and renovations).
Estimate only. Confirm with the Dunedin building department before applying.
Homeowners and contractors planning a project check Dunedin plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDunedin Permit Fee FAQs
How Much Is a Building Permit in Dunedin?
How Much Is a Roofing Permit in Dunedin?
How Are Permit Fees Calculated in Dunedin?
What Is the Minimum Permit Fee in Dunedin?
What Surcharges Are Added to Permits in Dunedin?
Do I Need a Permit for a Small Residential Job in Dunedin?
Where Do These Fees Come From?
Compare Permit Fees Across Pinellas County
The same job, priced by each jurisdiction's own fee schedule. Across Pinellas County's 12 covered jurisdictions, a building permit for a $50,000 remodel runs from $355.63 (Tarpon Springs) to $1,701.25 (South Pasadena).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Clearwater | $471.39 | $218.67 |
| Dunedin | $510.00 | $204.40 |
| Gulfport | $1,165.10 | $570.35 |
| Largo | $662.50 | $265.00 |
| Madeira Beach | $637.50 | $205.00 |
| Pinellas Park | $582.18 | $319.11 |
| Seminole | $831.13 | $337.03 |
| South Pasadena | $1,701.25 | $686.25 |
| St. Pete Beach | $871.25 | $307.50 |
| St. Petersburg | $388.75 | $154.25 |
| Tarpon Springs | $355.63 | $171.48 |
| Treasure Island | $606.80 | $268.55 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.