Building Permit Fees in Madeira Beach, FL (2026)
In Madeira Beach, a building permit for a $50,000 remodel runs $637.50 in permit fees, a $20,000 re-roof $205.00, a $10,000 HVAC change-out $104.00, a $10,000 electrical panel upgrade or rewire $104.00, and a $10,000 whole-house repipe $104.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Exhibit A - Ordinance 2025-13, Fees and Collection Procedure Manual (Building Permit Fee Schedule, Article II.T) - currently effective per Ord. 2025-18
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Madeira Beach values a job: Chargeable valuation is the Total Project Value, including materials, labor, and other related costs, as stated on the permit application.
Schedule effective June 11, 2025. Last verified: August 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Madeira Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Madeira Beach
Homeowners and contractors planning a project check Madeira Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMadeira Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Madeira Beach are the same either way.
Fees in Madeira Beach are the same either way.
Chargeable valuation is the Total Project Value, including materials, labor, and other related costs, as stated on the permit application.
Estimate only. Confirm with the Madeira Beach building department before applying.
Homeowners and contractors planning a project check Madeira Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMadeira Beach Permit Fee FAQs
How Much Is a Building Permit in Madeira Beach?
How Much Is a Roofing Permit in Madeira Beach?
How Are Permit Fees Calculated in Madeira Beach?
What Surcharges Are Added to Permits in Madeira Beach?
Do I Need a Permit for a Small Residential Job in Madeira Beach?
Where Do These Fees Come From?
Compare Permit Fees Across Pinellas County
The same job, priced by each jurisdiction's own fee schedule. Across Pinellas County's 12 covered jurisdictions, a building permit for a $50,000 remodel runs from $355.63 (Tarpon Springs) to $1,701.25 (South Pasadena).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Clearwater | $471.39 | $218.67 |
| Dunedin | $510.00 | $204.40 |
| Gulfport | $1,165.10 | $570.35 |
| Largo | $662.50 | $265.00 |
| Madeira Beach | $637.50 | $205.00 |
| Pinellas Park | $582.18 | $319.11 |
| Seminole | $831.13 | $337.03 |
| South Pasadena | $1,701.25 | $686.25 |
| St. Pete Beach | $871.25 | $307.50 |
| St. Petersburg | $388.75 | $154.25 |
| Tarpon Springs | $355.63 | $171.48 |
| Treasure Island | $606.80 | $268.55 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.