FreeEvery fee straight from the official city and county fee schedules. No signup.

Madeira Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Madeira Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Madeira Beach, a building permit for a $50,000 remodel runs $637.50 in permit fees, a $20,000 re-roof $205.00, a $10,000 HVAC change-out $104.00, a $10,000 electrical panel upgrade or rewire $104.00, and a $10,000 whole-house repipe $104.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Exhibit A - Ordinance 2026-08, Fees and Collection Procedure Manual (Building Permit Fee Schedule, Article II.Q), adopted September 9, 2026

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Madeira Beach permit portal, or call 727-391-9951.

How Madeira Beach values a job: Chargeable valuation is the Total Project Value, including materials, labor, and other related costs, as stated on the permit application.

Schedule effective September 9, 2026. Last verified: October 14, 2026

This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed

Madeira Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Madeira Beach

All projects
1% of job value
Fire Plan Review (site and building plans)
$0.05 per square foot‡
Plan Review Fee
25% of the permit fee, jobs over $29,999.99 only
State Building Permit Surcharges (F.S. 553.721 + 468.631, combined)
2.5% of the permit fee, minimum $4.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Madeira Beach

Homeowners and contractors planning a project check Madeira Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Madeira Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Madeira Beach are the same either way.

$
$500$100,000
Estimated electrical permit fee
$104.00
Included in this total
Electrical Permit Fee$100.00
$10,000 × 1%
State Building Permit Surcharges (F.S. 553.721 + 468.631, Combined)$4.00
Total Estimate$104.00

Chargeable valuation is the Total Project Value, including materials, labor, and other related costs, as stated on the permit application.

Estimate only. Confirm with the Madeira Beach building department before applying. Apply online. Phone: 727-391-9951. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Madeira Beach

Homeowners and contractors planning a project check Madeira Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Madeira Beach

Madeira Beach runs its own Building Department at City Hall. Submit permit applications online through the MGO Connect (My Government Online) portal, where you can also track your project. Schedule inspections through the same MGO portal; required inspections are listed on your permit card. Fees can be paid in person at the City Hall Permit Desk, by mailed check or money order, or by credit card over the phone.

Source: Madeira Beach application instructions

Apply online: Madeira Beach permit portal
Building Department Contact
Address
300 Municipal Drive, Madeira Beach, FL 33708
Hours
Monday to Friday, 8:30 am to 4:30 pm

Madeira Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Madeira Beach?

The building permit for a $50,000 residential remodel runs $637.50, including the documented surcharges and minimum fees. The estimate is built from Madeira Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Madeira Beach?

The roofing permit for a $20,000 residential re-roof runs $205.00, based on Madeira Beach's sourced fee schedule.

How Are Permit Fees Calculated in Madeira Beach?

A residential building permit is 1% of job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Madeira Beach?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (25% of the permit fee, jobs over $29,999.99 only) and State Building Permit Surcharges (F.S. 553.721 + 468.631, combined) (2.5% of the permit fee, minimum $4.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Madeira Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Exhibit A - Ordinance 2026-08, Fees and Collection Procedure Manual (Building Permit Fee Schedule, Article II.Q), adopted September 9, 2026. See the official schedule. Last verified .

Other Jurisdictions in Pinellas County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.