Oldsmar, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Oldsmar, straight from the official fee schedule, with a free permit fee calculator below.
Jump to Permit Fee CalculatorBuilding permit fees for Oldsmar are administered by Pinellas County Building and Development Review Services under an Interlocal Agreement effective September 1, 2021. See the Pinellas County fee schedule
In Oldsmar, a building permit for a $50,000 remodel runs $798.75 in permit fees, a $20,000 re-roof $412.50, a $10,000 HVAC change-out $344.00, a $10,000 electrical panel upgrade or rewire $344.00, and a $10,000 whole-house repipe $344.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Pinellas County FY25 Adopted Budget, User Fees, Building and Development Review Services fee schedule (effective Oct. 1, 2024; carried unchanged in the FY26 Adopted Budget)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building permit fees for Oldsmar are administered by Pinellas County Building and Development Review Services under an Interlocal Agreement effective September 1, 2021. See the Pinellas County fee schedule
How Oldsmar values a job: Pinellas County bases permit fees on the construction valuation of the work, including all labor and materials for all trades. For new construction the valuation must be at least the latest International Code Council building valuation data for the gross work area; shell buildings use at least 60 percent of that data and remodels, rehabs, and repairs at least 40 percent.
Schedule effective October 1, 2024. Last verified: September 16, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Oldsmar Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Oldsmar
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Oldsmar roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageOldsmar Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Oldsmar are the same either way.
Assumes a $20,000.00 total job value for valuation-based surcharges.
Permit fees for Oldsmar are administered by Pinellas County; the fees shown are the Pinellas County schedule.
Estimate only. Confirm with the Pinellas County building department before applying.
Homeowners and contractors planning a project check Oldsmar roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageOldsmar Permit Fee FAQs
How Much Does a Building Permit Cost in Oldsmar?
How Much Does a Roofing Permit Cost in Oldsmar?
How Are Permit Fees Calculated in Oldsmar?
What Surcharges Are Added to Permits in Oldsmar?
Do I Need a Permit for a Small Residential Job in Oldsmar?
Where Do These Fees Come From?
Other Jurisdictions in Pinellas County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.