Building Permit Fees in St. Petersburg, FL (2026)
In St. Petersburg, a building permit for a $50,000 remodel runs $388.75 in permit fees, a $20,000 re-roof $154.25, a $10,000 HVAC change-out $74.00, a $10,000 electrical panel upgrade or rewire $74.00, and a $10,000 whole-house repipe $74.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
St. Petersburg Code of Ordinances, Ch. 12 (Fees), Sec. 12-6(6) - Construction Services Division Permits and Fees (Supp. No. 54, codified through Ord. No. 632-H; Sec. 12-6 itself last amended by Ord. No. 624-H, 12-4-2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $50.00.
How St. Petersburg values a job: New construction valuation is based on ICC Building Valuation Data per square foot (with a 0.85 regional cost factor) unless a valid contractor cost breakdown is submitted and approved; alterations and tenant buildouts use 50% of that calculated value unless a valid cost breakdown is submitted and approved.
Schedule effective December 4, 2025. Last verified: August 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
St. Petersburg Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in St. Petersburg
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check St. Petersburg electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSt. Petersburg Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in St. Petersburg are the same either way.
New construction valuation is based on ICC Building Valuation Data per square foot (with a 0.85 regional cost factor) unless a valid contractor cost breakdown is submitted and approved; alterations and tenant buildouts use 50% of that calculated value unless a valid cost breakdown is submitted and approved.
Estimate only. Confirm with the St. Petersburg building department before applying.
Homeowners and contractors planning a project check St. Petersburg electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSt. Petersburg Permit Fee FAQs
How Much Is a Building Permit in St. Petersburg?
How Much Is a Roofing Permit in St. Petersburg?
How Are Permit Fees Calculated in St. Petersburg?
What Is the Minimum Permit Fee in St. Petersburg?
What Surcharges Are Added to Permits in St. Petersburg?
Do I Need a Permit for a Small Residential Job in St. Petersburg?
Where Do These Fees Come From?
Compare Permit Fees Across Pinellas County
The same job, priced by each jurisdiction's own fee schedule. Across Pinellas County's 12 covered jurisdictions, a building permit for a $50,000 remodel runs from $355.63 (Tarpon Springs) to $1,701.25 (South Pasadena).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Clearwater | $471.39 | $218.67 |
| Dunedin | $510.00 | $204.40 |
| Gulfport | $1,165.10 | $570.35 |
| Largo | $662.50 | $265.00 |
| Madeira Beach | $637.50 | $205.00 |
| Pinellas Park | $582.18 | $319.11 |
| Seminole | $831.13 | $337.03 |
| South Pasadena | $1,701.25 | $686.25 |
| St. Pete Beach | $871.25 | $307.50 |
| St. Petersburg | $388.75 | $154.25 |
| Tarpon Springs | $355.63 | $171.48 |
| Treasure Island | $606.80 | $268.55 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.