FreeEvery fee straight from the official city and county fee schedules. No signup.

St. Petersburg, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for St. Petersburg, straight from the official fee schedule, with a free permit fee calculator below.

St. Petersburg is proposing a restructured building permit fee schedule with lower valuation rates, a new $75 per-inspection fee, a $15 technology fee, and plan review folded into the permit fee. A City Council committee endorsed it on August 27, 2026, but it has not been adopted. Estimates here use the fee schedule currently in the City Code. See the official notice

In St. Petersburg, a building permit for a $50,000 remodel runs $432.83 in permit fees, a re-roof $154.25, a $10,000 HVAC change-out $69.00, a $10,000 electrical panel upgrade or rewire $117.00, and a $10,000 whole-house repipe $117.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

St. Petersburg Code of Ordinances, Ch. 12 (Fees), Sec. 12-6(6) - Construction Services Division Permits and Fees (Supp. No. 55, Update 1, codified through Ord. No. 635-H; Sec. 12-6 itself last amended by Ord. No. 624-H, 12-4-2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the St. Petersburg permit portal, or call 727-893-7231.

How St. Petersburg values a job: New construction valuation is based on ICC Building Valuation Data per square foot (with a 0.85 regional cost factor) unless a valid contractor cost breakdown is submitted and approved; alterations and tenant buildouts use 50% of that calculated value unless a valid cost breakdown is submitted and approved.

Schedule effective December 4, 2025. Last verified: October 14, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

St. Petersburg Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in St. Petersburg

Residential (1–2 family)
tiered rates by job value, minimum $50.00 ($50 for the first $1,000, then $7 per $1,000 or fraction)†
Up to $1,000
$50.00
Over $1,000, up to $1,000,000
$50.00 plus $7.00 per additional $1,000
Over $1,000,000
$9,000.00 plus $3.00 per additional $1,000
Residential (1–2 family): Water heater / tankless changeout (service permit, flat)
$65.00 flat
Commercial / 3+ units
tiered rates by job value, minimum $50.00 ($50 for the first $1,000, then $9 per $1,000 or fraction)†
Up to $1,000
$50.00
Over $1,000, up to $1,000,000
$50.00 plus $9.00 per additional $1,000
Over $1,000,000
$9,000.00 plus $3.00 per additional $1,000
Solar pool heating (flat)
$100.00 flat
Solar water heater, includes electric permit if required (flat)
$200.00 flat
Other - Plumbing with no required plan review and one inspection (flat)
$65.00 flat
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Early Release of Power (Commercial) (if applicable)
$125.00
Early Release of Power (Residential) (if applicable)
$50.00
Early Start Authorization (per Request) (if applicable)
$100.00
Extension After Permit Expiration (if applicable)
$250.00
Extension After Permit Expiration (Two or More Permits, Same Parcel) (if applicable)
$350.00
Permit Extension up to 90 Days (Commercial) (if applicable)
$75.00
Permit Extension up to 90 Days (Residential) (if applicable)
$50.00
Permit Extension, Each Additional 30 Days (if applicable)
$250.00
Property Owner Permit Surcharge (if applicable)
$20.00, jobs over $2,000 only
Reinspection After a Second Failed Reinspection (if applicable)
$100.00
Saturday Inspection (Minimum of Three Inspections) (if applicable)
$90.00 per inspection (Saturday, minimum three)

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Plumber in St. Petersburg

Homeowners and contractors planning a project check St. Petersburg plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

St. Petersburg Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

5 documented rates for this permit type; pick the one that matches your job.

$
$500$50,000
Estimated plumbing permit fee
$117.00
Included in this total
Plumbing Permit Fee$113.00
$50.00 + 9 × $7.00 per $1,000 over $1,000, minimum $50.00 (see the fee table above)
$50 for the first $1,000, then $7 per $1,000 or fraction
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$117.00

St. Petersburg is proposing a restructured building permit fee schedule with lower valuation rates, a new $75 per-inspection fee, a $15 technology fee, and plan review folded into the permit fee. A City Council committee endorsed it on August 27, 2026, but it has not been adopted. Estimates here use the fee schedule currently in the City Code. See the official notice

New construction valuation is based on ICC Building Valuation Data per square foot (with a 0.85 regional cost factor) unless a valid contractor cost breakdown is submitted and approved; alterations and tenant buildouts use 50% of that calculated value unless a valid cost breakdown is submitted and approved.

Estimate only. Confirm with the St. Petersburg building department before applying. Apply online. Phone: 727-893-7231. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Plumber in St. Petersburg

Homeowners and contractors planning a project check St. Petersburg plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in St. Petersburg

Apply online through the City's Online Building Permits System (Click2Gov). Electronic plan submittals go through the same portal, and you have 10 business days to finish uploads and answer intake comments. A notarized application signed by the license holder or an authorized agent is required before the permit is issued. You can also apply in person at the Municipal Services Center permitting office, One 4th St. N., where appointments can be booked online. Schedule inspections through the Online Building Permits System using your permit number.

Source: St. Petersburg application instructions

Apply online: St. Petersburg permit portal
Building Department Contact
Phone
727-893-7231 (ePlan help desk 727-893-7230)
Email
permits@stpete.org; eplanreview@stpete.org
Address
Municipal Services Center, One 4th St. N., St. Petersburg, FL 33701
Hours
Mon, Tue, Thu, Fri 8 am to 4 pm; Wed 8 am to 12 pm

St. Petersburg Permit Fee FAQs

How Much Does a Building Permit Cost in St. Petersburg?

The building permit for a $50,000 residential remodel runs $432.83, including the documented surcharges and minimum fees. The estimate is built from St. Petersburg's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in St. Petersburg?

The roofing permit for a residential re-roof runs $154.25, assuming a 2,000 sq ft (20-square) roof (the schedule prices per unit), based on St. Petersburg's sourced fee schedule.

How Are Permit Fees Calculated in St. Petersburg?

A residential building permit is tiered rates by job value, minimum $50.00 ($50 for the first $1,000, then $7 per $1,000 or fraction). Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC permits are flat fees for the default job (A/C unit changeout, service permit, flat), while other work scales with the value of the job; Roofing permits are priced per square. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in St. Petersburg?

On top of the base permit fee, the sourced schedule adds Building Plan Review – All Other Uses (Commercial/Multifamily/Industrial) (20% of the permit fee, minimum $50.00), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in St. Petersburg?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from St. Petersburg Code of Ordinances, Ch. 12 (Fees), Sec. 12-6(6) - Construction Services Division Permits and Fees (Supp. No. 55, Update 1, codified through Ord. No. 635-H; Sec. 12-6 itself last amended by Ord. No. 624-H, 12-4-2025). See the official schedule. Last verified .

Other Jurisdictions in Pinellas County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.