Building Permit Fees in Mount Dora, FL (2026)
In Mount Dora, a $50,000 remodel (building permit) runs about $488.13 in permit fees, a $15,000 re-roof about $179.25, an $8,000 HVAC change-out about $124.00, a $12,000 electrical panel upgrade or rewire about $124.00, an $8,000 whole-house repipe about $124.00, and a new $350,000 single-family home about $3,160.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only — a job that combines trades (a kitchen remodel with electrical and plumbing work, say) pays each applicable permit. Pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Mount Dora Fee Schedule for Building Department (Effective 10/1/2025, revised 10/2/2025), pp.1-14; stapled with Meter and Impact Fees (Effective 1/1/2026, revised 1/8/2026), pp.15-23 [not used — out of scope], last verified August 3, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
Electrical Permit Fees in Mount Dora
‡ Awaiting confirmation from the jurisdiction.
City of Mount Dora Fee Schedule for Building Department (Effective 10/1/2025, revised 10/2/2025), pp.1-14; stapled with Meter and Impact Fees (Effective 1/1/2026, revised 1/8/2026), pp.15-23 [not used — out of scope]
How Mount Dora values a job: New one- and two-family residential construction and additions are valued using ICC (International Code Council) Building Valuation Data — value per square foot by construction type — multiplied by total square footage, rather than contractor-stated project cost.
Schedule effective October 1, 2025. Last verified: August 3, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Estimate only. Confirm with the Mount Dora building department before applying.