Building Permit Fees in Dundee, FL (2026)
In Dundee, a $50,000 remodel (building permit) runs about $655.46 in permit fees, a $15,000 re-roof about $236.16, an $8,000 HVAC change-out about $162.50, a $12,000 electrical panel upgrade or rewire about $200.22, an $8,000 whole-house repipe about $162.50, and a new $350,000 single-family home about $3,308.03. Totals include the documented surcharges and minimum fees. Each figure is that single permit only — a job that combines trades (a kitchen remodel with electrical and plumbing work, say) pays each applicable permit. Pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from Town of Dundee Building Permit Fee Schedule (October 1, 2025 - September 30, 2027), per Resolution No. 01-07 (adopted 3/13/2001, with automatic 5% biennial escalator), page-footer stamped 'Revised 3/11/2026', last verified August 4, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
Plumbing Permit Fees in Dundee
‡ Awaiting confirmation from the jurisdiction.
Town of Dundee Building Permit Fee Schedule (October 1, 2025 - September 30, 2027), per Resolution No. 01-07 (adopted 3/13/2001, with automatic 5% biennial escalator), page-footer stamped 'Revised 3/11/2026'
How Dundee values a job: Chargeable valuation is based on the signed construction contract, or the Standard Building Code Evaluation Schedule if no contract is provided.
Schedule effective October 1, 2025. Last verified: August 4, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Chargeable valuation is based on the signed construction contract, or the Standard Building Code Evaluation Schedule if no contract is provided.
Estimate only. Confirm with the Dundee building department before applying.