Building Permit Fees in Lakeland, FL (2026)

In Lakeland, a $50,000 remodel (building permit) runs about $333.03 in permit fees, a $15,000 re-roof about $107.50, an $8,000 HVAC change-out about $107.50, a $12,000 electrical panel upgrade or rewire about $107.50, an $8,000 whole-house repipe about $161.50, and a new $350,000 single-family home about $1,826.70. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope. Each figure is that single permit only — a job that combines trades (a kitchen remodel with electrical and plumbing work, say) pays each applicable permit. Pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Lakeland Building Inspection Division — Permit Fees (official fee webpage, self-attested current as of June 2026), last verified August 3, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Electrical Permit Fees in Lakeland

Residential (1–2 family)
$72.00 flat
Residential (1–2 family)
$81.00 flat
Residential (1–2 family) — Repair
$40.50 flat
Commercial / 3+ units
$0.027 per square foot of building area, minimum $72.00
Commercial / 3+ units — Low Voltage Wiring (per building, up to 6 units, then per additional unit)
$54.00 for the first 6 unit, plus $5.40 per unit
Commercial / 3+ units — Multi-Family (base + per additional unit)
$72.00 for the first 1 unit, plus $40.50 per unit
Commercial / 3+ units — Warehouse/Storage/Shell
$0.013 per square foot of building area, minimum $40.50
FL Statutory Surcharge
2.5% of the permit fee, minimum $4.00
Plan Review (Commercial & Multi-Family)
50% of the permit fee, minimum $45.00
Plan Review (Residential 1-2 Family & Accessory Structures)
25% of the permit fee, minimum $31.50

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Source

City of Lakeland Building Inspection Division — Permit Fees (official fee webpage, self-attested current as of June 2026)

Last verified: August 3, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated electrical permit fee
$107.50
Electrical permit fee$72.00
$72.00 flat
FL Statutory Surcharge$4.00
Plan Review (Residential 1-2 Family & Accessory Structures)$31.50
Total estimate$107.50

Estimate only. Confirm with the Lakeland building department before applying.

Other jurisdictions in Polk County