FreeEvery fee straight from the official city and county fee schedules. No signup.

Fruitland Park, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Fruitland Park, straight from the official fee schedule, with a free permit fee calculator below.

In Fruitland Park, a building permit for a $50,000 remodel runs $326.00 in permit fees, a $20,000 re-roof $329.38, a $10,000 HVAC change-out $270.88, a $10,000 electrical panel upgrade or rewire $270.88, and a $10,000 whole-house repipe $270.88. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Fruitland Park - Building Permit, Fire Plan Review & Inspection, and Administrative Fees (adopted via Resolution 2026-030, June 25, 2026, effective immediately; HB 803/Chapter 2026-63 compliance restructuring)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective June 25, 2026. Last verified: August 4, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Fruitland Park Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Fruitland Park

Residential (1–2 family)
$175.00 flat
Commercial / 3+ units
$300.00 flat
Administrative Fee
15% of the permit fee, minimum $7.50
Application Intake Fee
$65.00
DBPR Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Plan Review (Commercial)
25% of the permit fee

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Fruitland Park

Homeowners and contractors planning a project check Fruitland Park electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Fruitland Park Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated electrical permit fee
$270.88
Electrical permit fee$175.00
$175.00 flat
Application Intake Fee$65.00
Administrative Fee$26.25
DBPR Surcharge (F.S. 468.631)$2.63
FL Building Code Surcharge (F.S. 553.721)$2.00
Total Estimate$270.88

Estimate only. Confirm with the Fruitland Park building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Fruitland Park

Homeowners and contractors planning a project check Fruitland Park electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Fruitland Park Permit Fee FAQs

How Much Does a Building Permit Cost in Fruitland Park?

The building permit for a $50,000 residential remodel runs $326.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Fruitland Park's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Fruitland Park?

The roofing permit for a $20,000 residential re-roof runs $329.38, based on Fruitland Park's sourced fee schedule.

How Are Permit Fees Calculated in Fruitland Park?

A residential building permit is $0.95 per square foot, minimum $200.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Fruitland Park?

On top of the base permit fee, the sourced schedule adds Administrative Fee (15% of the permit fee, minimum $7.50), DBPR Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and Plan Review (Commercial) (25% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Fruitland Park?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Fruitland Park - Building Permit, Fire Plan Review & Inspection, and Administrative Fees (adopted via Resolution 2026-030, June 25, 2026, effective immediately; HB 803/Chapter 2026-63 compliance restructuring). See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.