Building Permit Fees in Fruitland Park, FL (2026)

In Fruitland Park, a $50,000 remodel (building permit) runs about $326.00 in permit fees, a $15,000 re-roof about $329.38, an $8,000 HVAC change-out about $270.88, a $12,000 electrical panel upgrade or rewire about $270.88, an $8,000 whole-house repipe about $270.88, and a new $350,000 single-family home about $2,806.75. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope. Each figure is that single permit only — a job that combines trades (a kitchen remodel with electrical and plumbing work, say) pays each applicable permit. Pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Fruitland Park - Building Permit, Fire Plan Review & Inspection, and Administrative Fees (adopted via Resolution 2026-030, June 25, 2026, effective immediately; HB 803/Chapter 2026-63 compliance restructuring), last verified August 4, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Mechanical / HVAC Permit Fees in Fruitland Park

Residential (1–2 family)
$175.00 flat
Commercial / 3+ units
$300.00 flat
Administrative Fee
15% of the permit fee, minimum $7.50
Application Intake Fee
$65.00
DBPR Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Plan Review (Commercial)
25% of the permit fee

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Source

City of Fruitland Park - Building Permit, Fire Plan Review & Inspection, and Administrative Fees (adopted via Resolution 2026-030, June 25, 2026, effective immediately; HB 803/Chapter 2026-63 compliance restructuring)

Schedule effective June 25, 2026. Last verified: August 4, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated mechanical / HVAC permit fee
$270.88
Mechanical / HVAC permit fee$175.00
$175.00 flat
Administrative Fee$26.25
Application Intake Fee$65.00
DBPR Surcharge (F.S. 468.631)$2.63
FL Building Code Surcharge (F.S. 553.721)$2.00
Total estimate$270.88

Estimate only. Confirm with the Fruitland Park building department before applying.

Other jurisdictions in Lake County