FreeEvery fee straight from the official city and county fee schedules. No signup.

Minneola, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Minneola, straight from the official fee schedule, with a free permit fee calculator below.

In Minneola, a building permit for a $50,000 remodel runs $515.25 in permit fees, a $20,000 re-roof $58.00, a $10,000 HVAC change-out $69.00, a $10,000 electrical panel upgrade or rewire $69.00, and a $10,000 whole-house repipe $69.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Commercial Permit Fee Schedule (rev. 2/7/12) and Residential Permit Fee Schedule (rev. 2/7/12) -- City of Minneola Building Department

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Minneola values a job: Chargeable valuation is determined using the International Code Council (ICC) Building Safety Journal building valuation data (cost per square foot of all areas under roof), based on construction type and use.

Schedule effective February 7, 2012. Last verified: August 4, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Minneola Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Minneola

Residential (1–2 family)
$9.00 per $1,000 of job value, minimum $54.00
Residential (1–2 family)
$6.30 per $1,000 of job value, minimum $54.00
Commercial / 3+ units
$9.00 per $1,000 of job value, minimum $54.00
Commercial / 3+ units: Occupancy & Change of Use / Other
$54.00 flat
Demolition/Razing (no utilities)
$54.00 for the first 2000 square foot, plus $18.00 per 1,000 square feet
Demolition/Razing (with utilities)
$90.00 for the first 2000 square foot, plus $45.00 per 1,000 square feet
FL Building Code Enforcement Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
FL Building Code Training Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Plan Review Fee (Commercial)
0.18% of job value, minimum $180.00
Plan Review Fee (Residential)
0.054% of job value, minimum $54.00
Permit Extension/Renewal Fee (if applicable)
$200.00
Re-inspection Fee (if applicable)
$54.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Minneola

Homeowners and contractors planning a project check Minneola building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Minneola Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
$
$2,500$500,000
Estimated building permit fee
$515.25
Building permit fee$450.00
$9.00 per $1,000 of job value, minimum $54.00
Plan Review Fee (Residential)$54.00
FL Building Code Enforcement Surcharge (F.S. 553.721)$4.50
FL Building Code Training Surcharge (F.S. 468.631)$6.75
Total Estimate$515.25

Chargeable valuation is determined using the International Code Council (ICC) Building Safety Journal building valuation data (cost per square foot of all areas under roof), based on construction type and use.

Estimate only. Confirm with the Minneola building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Minneola

Homeowners and contractors planning a project check Minneola building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Minneola Permit Fee FAQs

How Much Does a Building Permit Cost in Minneola?

The building permit for a $50,000 residential remodel runs $515.25, including the documented surcharges and minimum fees. The estimate is built from Minneola's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Minneola?

The roofing permit for a $20,000 residential re-roof runs $58.00, based on Minneola's sourced fee schedule.

How Are Permit Fees Calculated in Minneola?

A residential building permit is $9.00 per $1,000 of job value, minimum $54.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Minneola?

On top of the base permit fee, the sourced schedule adds FL Building Code Enforcement Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and FL Building Code Training Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Minneola?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Commercial Permit Fee Schedule (rev. 2/7/12) and Residential Permit Fee Schedule (rev. 2/7/12) -- City of Minneola Building Department. See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.