Building Permit Fees in Fort Meade, FL (2026)

In Fort Meade, a $50,000 remodel (building permit) runs about $384.22 in permit fees, an $8,000 HVAC change-out about $144.00, a $12,000 electrical panel upgrade or rewire about $144.00, an $8,000 whole-house repipe about $144.00, and a new $350,000 single-family home about $841.50. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope. Each figure is that single permit only — a job that combines trades (a kitchen remodel with electrical and plumbing work, say) pays each applicable permit. Pick a project to load it in the calculator below.

Covers building, electrical, plumbing, and mechanical/HVAC permits. Fees from City of Fort Meade Resolution R-20-30, Exhibit "A" (Building/Electrical/Plumbing/Gas/Mechanical Permit Fees) -- adopted/effective 2020-10-13, replacing pp.11-18 of Resolution R-15-15's Exhibit A, last verified August 4, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Electrical Permit Fees in Fort Meade

Residential (1–2 family)
$85.00 flat
Commercial / 3+ units
$85.00 for the first $1,000, plus $1.25 per additional $1,000 of job value
Fort Meade - FL BCAIB Education Surcharge (FS 468.631)
1.5% of the permit fee, minimum $2.00
Fort Meade - FL Building Code Surcharge (FS 553.721)
1% of the permit fee, minimum $2.00
Plan Review (Commercial)
25% of the permit fee, minimum $102.00
Plan Review (Residential)
25% of the permit fee, minimum $55.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Source

City of Fort Meade Resolution R-20-30, Exhibit "A" (Building/Electrical/Plumbing/Gas/Mechanical Permit Fees) -- adopted/effective 2020-10-13, replacing pp.11-18 of Resolution R-15-15's Exhibit A

How Fort Meade values a job: Where the applicant does not provide a signed construction contract or itemized cost estimate, the City determines chargeable valuation using its Minimum Valuation Data Table, a per-square-foot cost figure by building use/occupancy type (e.g. one- and two-family residential, business, mercantile, etc.).

Schedule effective October 13, 2020. Last verified: August 4, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated electrical permit fee
$144.00
Electrical permit fee$85.00
$85.00 flat
Fort Meade - FL BCAIB Education Surcharge (FS 468.631)$2.00
Fort Meade - FL Building Code Surcharge (FS 553.721)$2.00
Plan Review (Residential)$55.00
Total estimate$144.00

Estimate only. Confirm with the Fort Meade building department before applying.

Other jurisdictions in Polk County