FreeEvery fee straight from the official city and county fee schedules. No signup.

Lake Hamilton, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Lake Hamilton, straight from the official fee schedule, with a free permit fee calculator below.

In Lake Hamilton, a building permit for a $50,000 remodel runs $597.84 in permit fees, a $20,000 re-roof $271.15, a $10,000 HVAC change-out $163.53, a $10,000 electrical panel upgrade or rewire $163.53, and a $10,000 whole-house repipe $163.53. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Lake Hamilton, FL - Permit Fees (Town Code Sec. 8-24 & 8-25)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Lake Hamilton permit portal, or call 863-439-1910.

How Lake Hamilton values a job: Lake Hamilton values new construction using the ICC Building Valuation Data sheet, which the town updates every 6 months.

Last verified: September 30, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Lake Hamilton Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Lake Hamilton

All projects
tiered rates by job value‡
Up to $1,000
$22.00
Over $1,000, up to $50,000
$22.00 plus $7.15 per additional $1,000
Over $50,000, up to $100,000
$372.35 plus $6.33 per additional $1,000
Over $100,000, up to $500,000
$630.25 plus $5.23 per additional $1,000
Over $500,000
$2,772.28 plus $4.68 per additional $1,000
Administrative Fee
$30.00
Plan Review Fee
50% of the permit fee‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Re-inspection Fee (if applicable)
$50.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Lake Hamilton

Homeowners and contractors planning a project check Lake Hamilton roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lake Hamilton Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$271.15
Included in this total
Roofing Permit Fee$157.85‡
$22.00 + 19 × $7.15 per $1,000 over $1,000 (see the fee table above)
Administrative Fee$30.00
Plan Review Fee$78.93‡
State Building Code Administrators Surcharge (F.S. 468.631)$2.37
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$271.15

‡ Awaiting confirmation from the jurisdiction.

Lake Hamilton values new construction using the ICC Building Valuation Data sheet, which the town updates every 6 months.

Estimate only. Confirm with the Lake Hamilton building department before applying. Apply online. Phone: 863-439-1910. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Lake Hamilton

Homeowners and contractors planning a project check Lake Hamilton roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Lake Hamilton

Lake Hamilton's Community Development Department handles permitting; the town asks applicants who have not heard back within three days to call and ask for Shawna. Apply online through the town's iWorQ Citizen Portal, which handles application submission and document upload; large plans and new construction go through the permitting department instead. Alternatively, download the Building Permit Application PDF, complete it, and email it with the supporting documents (signed and notarized application, Notice of Commencement if required, engineered plans, site plan, and Florida product approval sheets). Contractors register first with their state license, county business tax receipt, certificate of liability naming the Town, and workers compensation proof; registration is free. Inspections are requested through the Building Inspection Request form on the town website.

Source: Lake Hamilton application instructions

Apply online: Lake Hamilton permit portal
Building Department Contact
Address
100 Smith Avenue, PO Box 126, Lake Hamilton, FL 33851
Hours
Monday through Friday, 8 am to 5 pm

Lake Hamilton Permit Fee FAQs

How Much Does a Building Permit Cost in Lake Hamilton?

The building permit for a $50,000 residential remodel runs $597.84, including the documented surcharges and minimum fees. The estimate is built from Lake Hamilton's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Lake Hamilton?

The roofing permit for a $20,000 residential re-roof runs $271.15, based on Lake Hamilton's sourced fee schedule.

How Are Permit Fees Calculated in Lake Hamilton?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Lake Hamilton?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (50% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Lake Hamilton?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Lake Hamilton, FL - Permit Fees (Town Code Sec. 8-24 & 8-25). See the official schedule. Last verified .

Other Jurisdictions in Polk County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.