FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Mulberry, FL (2026)

In Mulberry, a building permit for a $50,000 remodel runs $741.26 in permit fees, a $20,000 re-roof $345.38, a $10,000 HVAC change-out $214.47, a $10,000 electrical panel upgrade or rewire $214.47, and a $10,000 whole-house repipe $214.47. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Mulberry Resolution RES-2024-15, Exhibit A – Schedule of Building Permit Fees (adopted/effective October 1, 2024; via CivicWeb Document Center, Resolutions/2024)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Mulberry values a job: Construction valuation is determined using the most current ICC Building Valuation Data (BVD) sheet, based on generally accepted industry standards.

Schedule effective October 1, 2024. Last verified: August 19, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Mulberry Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Mulberry

All projects
tiered rates (see fee table)
$0–$1,000
$39.95
$1,000–$2,000
$47.93
$2,000–$3,000
$57.25
$3,000–$4,000
$65.24
$4,000–$5,000
$74.55
$5,000–$6,000
$82.54
$6,000–$7,000
$91.87
$7,000–$8,000
$99.85
$8,000–$9,000
$109.17
$9,000–$10,000
$117.15
$10,000–$11,000
$126.48
$11,000–$12,000
$134.47
$12,000–$13,000
$143.78
$13,000–$14,000
$151.77
$14,000–$15,000
$161.10
$15,000–$16,000
$169.08
$16,000–$17,000
$178.40
$17,000–$18,000
$186.38
$18,000–$19,000
$195.70
$19,000–$20,000
$203.69
$20,000–$21,000
$213.01
$21,000–$22,000
$221.00
$22,000–$23,000
$230.32
$23,000–$24,000
$238.30
$24,000–$25,000
$247.63
$25,000–$26,000
$255.61
$26,000–$27,000
$264.92
$27,000–$28,000
$272.92
$28,000–$29,000
$282.23
$29,000–$30,000
$290.22
$30,000–$31,000
$299.54
$31,000–$32,000
$307.53
$32,000–$33,000
$316.85
$33,000–$34,000
$324.83
$34,000–$35,000
$332.82
$35,000–$36,000
$342.15
$36,000–$37,000
$351.46
$37,000–$38,000
$359.45
$38,000–$39,000
$368.76
$39,000–$40,000
$376.75
$40,000–$41,000
$386.08
$41,000–$42,000
$394.06
$42,000–$43,000
$403.37
$43,000–$44,000
$411.37
$44,000–$45,000
$420.68
$45,000–$46,000
$428.68
$46,000–$47,000
$436.66
$47,000–$48,000
$445.98
$48,000–$49,000
$455.31
$49,000–$50,000
$463.29
$50,000–$51,000
$471.28
$51,000–$52,000
$477.92
$52,000–$53,000
$484.59
$53,000–$54,000
$491.25
$54,000–$55,000
$497.90
$55,000–$56,000
$505.88
$56,000–$57,000
$512.54
$57,000–$58,000
$519.21
$58,000–$59,000
$525.85
$59,000–$60,000
$532.51
$60,000–$61,000
$540.50
$61,000–$62,000
$547.15
$62,000–$63,000
$553.82
$63,000–$64,000
$560.47
$64,000–$65,000
$567.13
$65,000–$66,000
$575.11
$66,000–$67,000
$581.77
$67,000–$68,000
$588.43
$68,000–$69,000
$595.08
$69,000–$70,000
$603.07
$70,000–$71,000
$609.73
$71,000–$72,000
$617.71
$72,000–$73,000
$623.04
$73,000–$74,000
$629.70
$74,000–$75,000
$637.68
$75,000–$76,000
$644.34
$76,000–$77,000
$649.66
$77,000–$78,000
$657.66
$78,000–$79,000
$664.31
$79,000–$80,000
$670.96
$80,000–$81,000
$678.96
$81,000–$82,000
$685.60
$82,000–$83,000
$692.27
$83,000–$84,000
$698.93
$84,000–$85,000
$705.58
$85,000–$86,000
$713.56
$86,000–$87,000
$720.22
$87,000–$88,000
$726.89
$88,000–$89,000
$733.53
$89,000–$90,000
$740.19
$90,000–$91,000
$748.18
$91,000–$92,000
$754.83
$92,000–$93,000
$761.49
$93,000–$94,000
$768.15
$94,000–$95,000
$774.81
$95,000–$96,000
$782.79
$96,000–$97,000
$789.45
$97,000–$98,000
$797.43
$98,000–$99,000
$802.76
$99,000–$100,000
$809.42
$100,000–$500,000
$814.74 + $8.11 per $1,000
Over $500,000
$4,056.09 + $3.48 per $1,000
Application Processing Fee
$34.74
FL Building Code Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Radon Gas Research Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Plan Review Fee
50% of the permit fee, jobs over $1,000 only

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Mulberry

Homeowners and contractors planning a project check Mulberry mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Mulberry Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Mulberry are the same either way.

Kind of work

Fees in Mulberry are the same either way.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$214.47
Mechanical / HVAC permit fee$117.15
tiered rates (see fee table)
Application Processing Fee$34.74
FL Building Code Surcharge (F.S. 468.631)$2.00
FL Radon Gas Research Surcharge (F.S. 553.721)$2.00
Plan Review Fee$58.58
Total Estimate$214.47

Construction valuation is determined using the most current ICC Building Valuation Data (BVD) sheet, based on generally accepted industry standards.

Estimate only. Confirm with the Mulberry building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Mulberry

Homeowners and contractors planning a project check Mulberry mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Mulberry Permit Fee FAQs

How Much Is a Building Permit in Mulberry?

The building permit for a $50,000 residential remodel runs $741.26, including the documented surcharges and minimum fees. The estimate is built from Mulberry's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Mulberry?

The roofing permit for a $20,000 residential re-roof runs $345.38, based on Mulberry's sourced fee schedule.

How Are Permit Fees Calculated in Mulberry?

A residential building permit is tiered rates (see fee table). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Mulberry?

On top of the base permit fee, the sourced schedule adds FL Building Code Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), FL Radon Gas Research Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and Plan Review Fee (50% of the permit fee, jobs over $1,000 only). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Mulberry?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Mulberry Resolution RES-2024-15, Exhibit A – Schedule of Building Permit Fees (adopted/effective October 1, 2024; via CivicWeb Document Center, Resolutions/2024). See the official schedule. Last verified .

Compare Permit Fees Across Polk County

The same job, priced by each jurisdiction's own fee schedule. Across Polk County's 16 covered jurisdictions, a building permit for a $50,000 remodel runs from $305.00 (Auburndale) to $875.12 (Haines City).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Polk County$384.22$190.33
Auburndale$305.00$124.00
Bartow$470.68$242.56
Davenport$502.25$214.10
Dundee$655.46$296.06
Fort Meade$384.22n/a
Haines City$875.12$389.71
Highland Park$384.22$190.33
Hillcrest Heights$384.22$190.33
Lake Alfred$544.00$224.00
Lake Hamilton$597.84$271.15
Lake Wales$715.47$336.66
Lakeland$333.03$107.50
Mulberry$741.26$345.38
Polk City$349.40n/a
Winter Haven$559.60n/a

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.