Golden Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Golden Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Golden Beach, a building permit for a $50,000 remodel runs $2,791.25 in permit fees, a $20,000 re-roof $2,314.25, a $10,000 HVAC change-out $2,042.75, a $10,000 electrical panel upgrade or rewire $2,347.75, and a $10,000 whole-house repipe $2,655.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Golden Beach Resolution No. 3083.26, Ratifying and Adopting the Town's Schedule of Building Permit Fees and Other Fees (FY 2026-27, adopted September 15, 2026), Exhibit A, which carries forward unchanged the schedule adopted by Resolution No. 3079.26 (June 9, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Golden Beach permit portal, or call 305-932-0744.
How Golden Beach values a job: Golden Beach sets a minimum declared value for permit purposes of $300 per square foot for remodeling and $400 per square foot for additions, town wide (Zones 1 through 3). The value based fees below are charged on the declared value of the work.
Schedule effective June 9, 2026. Last verified: September 25, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Golden Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Golden Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Golden Beach mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGolden Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Golden Beach are the same either way.
‡ Awaiting confirmation from the jurisdiction.
This fee rate is higher than in most Florida jurisdictions; it matches Golden Beach's official schedule as published.
Golden Beach sets a minimum declared value for permit purposes of $300 per square foot for remodeling and $400 per square foot for additions, town wide (Zones 1 through 3). The value based fees below are charged on the declared value of the work.
Estimate only. Confirm with the Golden Beach building department before applying. Apply online. Phone: 305-932-0744. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Golden Beach mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Golden Beach
Golden Beach accepts permit applications by email and through the online permit application form on the Town website. Only smaller permits can be filed online. Permits that need large signed and sealed plan sets must be submitted in person at a scheduled appointment, and walk-ins are suspended. Contractors must be registered with the Town before applying. The Town emails an invoice for the upfront review fee at intake, then a second invoice for the permit fees once the application is approved. Request inspections by email to inspections@goldenbeach.us by noon the day before.
Source: Golden Beach application instructions
Apply online: Golden Beach permit portal- Phone
- 305-932-0744 ext. 234
- Address
- 100 Ocean Boulevard, Golden Beach, FL 33160
- Hours
- Monday to Thursday 8:30 AM to 12:00 PM and 1:30 PM to 3:30 PM; Friday 8:30 AM to 12:00 PM; by appointment only
- Source
- Official contact page
Golden Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Golden Beach?
How Much Does a Roofing Permit Cost in Golden Beach?
How Are Permit Fees Calculated in Golden Beach?
What Surcharges Are Added to Permits in Golden Beach?
Do I Need a Permit for a Small Residential Job in Golden Beach?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.