Miami Shores, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Miami Shores, straight from the official fee schedule, with a free permit fee calculator below.

In Miami Shores, a building permit for a $50,000 remodel runs $1,882.50 in permit fees, a $20,000 re-roof $777.38, a $10,000 HVAC change-out $402.75, a $10,000 electrical panel upgrade or rewire $402.75, and a $10,000 whole-house repipe $402.75. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Exhibit A, 2022/2023 Building Department Schedule of Fees (Resolution No. 2022-14; village-provided schedule, emailed by the Village)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.

How Miami Shores values a job: Miami Shores bases valuation fees on the value of the work, including materials, labor, overhead and profit, and may verify the estimated cost against generally accepted published authorities.

Last verified: September 19, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Miami Shores Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Miami Shores

Residential (1–2 family) (remodel/alteration)
3.5% of job value
Residential (1–2 family) (new construction)
3% of job value
Commercial / 3+ units (remodel/alteration)
3% of job value
Commercial / 3+ units (new construction)
3.5% of job value
Demolition
$100.00 flat
Solar system
3% of job value
Underground utilities
$1.00 per linear foot, minimum $100.00
Certificate of occupancy/completion
$150.00, jobs over $15,000 only
Certificate of occupancy/completion
$200.00, jobs over $15,000 only
DBPR surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
DCA surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Miami-Dade County (BCCO) surcharge
0.06% of job value (Printed as $0.60 per $1,000.00 cost of construction)
Technology fee
10% of the permit fee
Training and education surcharge
0.03% of job value (Printed as $0.30 per $1,000.00 cost of construction)
Private provider credit (inspections only)
may reduce the permit fee by 9% (Printed as a nine percent (9%) Administrative Fee Credit)
Private provider credit (plan review and inspections)
may reduce the permit fee by 20% (Printed as a twenty percent (20%) Administrative Fee Credit)
Private provider credit (plan review only)
may reduce the permit fee by 12% (Printed as a twelve percent (12%) Administrative Fee Credit)
Application fee (credited toward permit fee)
$200.00
Printed as $200.00 per unit for a single family home or duplex; $150.00 per unit for buildings of three units or more
Application fee (credited toward permit fee)
$400.00
Printed as $400.00 for buildings up to 2,500 sq ft; each additional 1,000 sq ft or fraction adds $100.00, maximum $10,000.00
Preliminary plan review (if applicable)
$480.00
Printed as $480.00 per unit for a single family home or duplex; $200.00 per unit for three units or more; not credited toward the permit fee
Preliminary plan review (if applicable)
$500.00
Printed as $500.00 for buildings up to 2,500 sq ft; each additional 1,000 sq ft or fraction adds $100.00; not credited toward the permit fee
Reinspection fee (if applicable)
$85.00
Printed as $85.00 first occurrence; $100.00 second; $150.00 third occurrence

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Miami Shores

Homeowners and contractors planning a project check Miami Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Miami Shores Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

4 documented rates for this permit type; pick the one that matches your job.

$
$500$100,000
Estimated electrical permit fee
$402.75
Electrical Permit Fee$350.00
$10,000 × 3.5%
Miami-Dade County (BCCO) Surcharge$6.00
Training and Education Surcharge$3.00
DBPR Surcharge (F.S. 468.631)$5.25
DCA Surcharge (F.S. 553.721)$3.50
Technology Fee$35.00
Private provider reductions (F.S. 553.791), not applied: 9% of the permit fee‡ with a private provider for inspections; 20% of the permit fee‡ with a private provider for plan review and inspections; 12% of the permit fee‡ with a private provider for plan review. Confirm eligibility and reduced figures with the building department.
Total Estimate$402.75
Not included in this total
Application Fee$200.00
Paid up front; credited against the final permit fee.

‡ Awaiting confirmation from the jurisdiction.

Miami Shores bases valuation fees on the value of the work, including materials, labor, overhead and profit, and may verify the estimated cost against generally accepted published authorities.

Estimate only. Confirm with the Miami Shores building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Miami Shores

Homeowners and contractors planning a project check Miami Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Miami Shores Permit Fee FAQs

How Much Does a Building Permit Cost in Miami Shores?

The building permit for a $50,000 residential remodel runs $1,882.50, including the documented surcharges and minimum fees. The estimate is built from Miami Shores's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Miami Shores?

The roofing permit for a $20,000 residential re-roof runs $777.38, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Miami Shores's sourced fee schedule.

How Are Permit Fees Calculated in Miami Shores?

A residential building permit is 3% of job value. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Miami Shores?

The sourced schedule sets a minimum permit fee of $100.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Miami Shores?

On top of the base permit fee, the sourced schedule adds DBPR surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), DCA surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00), Private provider credit (inspections only) (may reduce the permit fee by 9% (Printed as a nine percent (9%) Administrative Fee Credit)), Private provider credit (plan review and inspections) (may reduce the permit fee by 20% (Printed as a twenty percent (20%) Administrative Fee Credit)), Private provider credit (plan review only) (may reduce the permit fee by 12% (Printed as a twelve percent (12%) Administrative Fee Credit)) and Technology fee (10% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Miami Shores?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Exhibit A, 2022/2023 Building Department Schedule of Fees (Resolution No. 2022-14; village-provided schedule, emailed by the Village). See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.