Miami Shores, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Miami Shores, straight from the official fee schedule, with a free permit fee calculator below.
In Miami Shores, a building permit for a $50,000 remodel runs $1,882.50 in permit fees, a $20,000 re-roof $777.38, a $10,000 HVAC change-out $402.75, a $10,000 electrical panel upgrade or rewire $402.75, and a $10,000 whole-house repipe $402.75. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorExhibit A, 2022/2023 Building Department Schedule of Fees (Resolution No. 2022-14; village-provided schedule, emailed by the Village)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.
How Miami Shores values a job: Miami Shores bases valuation fees on the value of the work, including materials, labor, overhead and profit, and may verify the estimated cost against generally accepted published authorities.
Last verified: September 19, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Miami Shores Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Miami Shores
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Miami Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Shores Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
4 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Miami Shores bases valuation fees on the value of the work, including materials, labor, overhead and profit, and may verify the estimated cost against generally accepted published authorities.
Estimate only. Confirm with the Miami Shores building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Miami Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Shores Permit Fee FAQs
How Much Does a Building Permit Cost in Miami Shores?
How Much Does a Roofing Permit Cost in Miami Shores?
How Are Permit Fees Calculated in Miami Shores?
What Is the Minimum Permit Fee in Miami Shores?
What Surcharges Are Added to Permits in Miami Shores?
Do I Need a Permit for a Small Residential Job in Miami Shores?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.