FreeEvery fee straight from the official city and county fee schedules. No signup.

Cutler Bay, FL Permit Fees (2026)

Building permit fees and electrical, plumbing, mechanical/HVAC, and roofing permit fees for Cutler Bay, straight from the official fee schedule, with a free permit fee calculator below.

In Cutler Bay, a re-roof runs $215.00 in permit fees, an HVAC change-out $140.50, a $10,000 electrical panel upgrade or rewire $623.50, and a $10,000 whole-house repipe $623.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof and a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Electrical Fee Sheet, Mechanical Fee Sheet; Plumbing and Gas Fee Sheet

Covers electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Cutler Bay permit portal, or call (305) 234-4193.

Last verified: September 1, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Cutler Bay Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Cutler Bay

Residential (1–2 family): Percent of Value (Alteration/Repair)
5.8% of job value, minimum $130.00†
Residential (1–2 family): Per Square Foot (New Construction)
$0.10 per square foot, minimum $130.00‡
Commercial / 3+ units
5.8% of job value, minimum $130.00‡
Miami-Dade County Code Administration Fee (Sec. 8-12)
5% of the permit fee†
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Temporary Construction Service Fee (if applicable)
$130.00
Temporary Service for Test Fee (if applicable)
$130.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Cutler Bay

Homeowners and contractors planning a project check Cutler Bay electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cutler Bay Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated electrical permit fee
$623.50
Included in this total
Electrical Permit Fee$580.00
$10,000 × 5.8%, minimum $130.00
Miami-Dade County Code Administration Fee (Sec. 8-12)$29.00
State Building Code Administrators Surcharge (F.S. 468.631)$8.70
State Building Permit Surcharge (F.S. 553.721)$5.80
Total Estimate$623.50

This fee rate is higher than in most Florida jurisdictions; it matches Cutler Bay's official schedule as published.

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Cutler Bay building department before applying. Apply online. Phone: (305) 234-4193. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Cutler Bay

Homeowners and contractors planning a project check Cutler Bay electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Cutler Bay

Apply for building, electrical, mechanical, plumbing and roofing permits in person at the Town of Cutler Bay Building Department in the Town Center, 10720 Caribbean Blvd., Suite 110. Download the permit application and the checklist for your work type from the Building Forms page and bring them with your plans; many checklists require a $130 up-front fee at submittal. The Town's Online Services site lets you check permit status, estimate fees and request inspections after you register. You can also request inspections by email at inspections@cutlerbay-fl.gov or through the Inspection Hotline at (786) 573-5515, with at least 24 hours notice.

Source: Cutler Bay application instructions

Apply online: Cutler Bay permit portal
Building Department Contact
Address
10720 Caribbean Blvd., Suite 110, Cutler Bay, FL 33189
Hours
Monday to Friday, 8 a.m. to 5 p.m. (Town Hall)

Cutler Bay Permit Fee FAQs

How Much Does a Roofing Permit Cost in Cutler Bay?

The roofing permit for a residential re-roof runs $215.00, assuming a 2,000 sq ft roof (the schedule prices per unit), based on Cutler Bay's sourced fee schedule.

How Are Permit Fees Calculated in Cutler Bay?

Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC permits are priced per ton; Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Cutler Bay?

On top of the base permit fee, the sourced schedule adds Miami-Dade County Code Administration Fee (Sec. 8-12) (5% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Cutler Bay?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Electrical Fee Sheet, Mechanical Fee Sheet; Plumbing and Gas Fee Sheet. See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.