FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Cutler Bay, FL (2026)

In Cutler Bay, a $10,000 HVAC change-out runs $140.50 in permit fees, a $10,000 electrical panel upgrade or rewire $140.50, and a $10,000 whole-house repipe $140.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Electrical Fee Sheet, Mechanical Fee Sheet; Plumbing and Gas Fee Sheet

Covers electrical, plumbing, and mechanical/HVAC permits.

Last verified: September 1, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Cutler Bay Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in Cutler Bay

Residential (1–2 family)
0.058% of job value, minimum $130.00
Residential (1–2 family)
$0.129 per square foot, minimum $130.00
Residential (1–2 family): Addition to SFR/Duplex
$0.129 per square foot, minimum $130.00
FL Building Code Enforcement Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Radon/DCA Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Miami-Dade County Code Administration Fee (Sec. 8-12)
5% of the permit fee
Additional Inspection Fee (if applicable)
$71.55

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Plumber in Cutler Bay

Homeowners and contractors planning a project check Cutler Bay plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cutler Bay Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$50,000
Estimated plumbing permit fee
$140.50
Plumbing permit fee$5.80
0.058% of job value, minimum $130.00
Minimum permit fee adjustment$124.20
Minimum permit fee: $130.00
FL Building Code Enforcement Surcharge (F.S. 468.631)$2.00
FL Radon/DCA Building Code Surcharge (F.S. 553.721)$2.00
Miami-Dade County Code Administration Fee (Sec. 8-12)$6.50
Total Estimate$140.50

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Cutler Bay building department before applying.

Sponsor This Page
Be the Featured Plumber in Cutler Bay

Homeowners and contractors planning a project check Cutler Bay plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cutler Bay Permit Fee FAQs

How Are Permit Fees Calculated in Cutler Bay?

Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC permits are priced per ton. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Cutler Bay?

On top of the base permit fee, the sourced schedule adds FL Building Code Enforcement Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), FL Radon/DCA Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and Miami-Dade County Code Administration Fee (Sec. 8-12) (5% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Cutler Bay?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Electrical Fee Sheet, Mechanical Fee Sheet; Plumbing and Gas Fee Sheet. See the official schedule. Last verified .

Compare Permit Fees Across Miami-Dade County

The same job, priced by each jurisdiction's own fee schedule. Across Miami-Dade County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $239.47 (Unincorporated Miami-Dade County) to $2,250.00 (Pinecrest).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Miami-Dade County$239.47$322.88
Aventura$295.63$258.00
Coral Gables$1,175.00$470.00
Cutler Bayn/an/a
Hialeah$1,155.00$450.00
Homestead$1,567.50$422.00
Key Biscayne$384.75$614.25
Miami$418.75$203.50
Miami Beach$1,602.25$640.90
Miami Gardens$1,968.75$341.00
Miami Lakesn/a$441.40
Palmetto Bayn/a$333.36
Pinecrest$2,250.00$685.00
South Miami$806.25$752.50
Sweetwater$818.65$413.50

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.