Doral, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Doral, straight from the official fee schedule, with a free permit fee calculator below.
Doral's new flat fee schedule (Resolution 26-134) takes effect October 1, 2026 and applies to all current and future permit applications; until then the prior valuation-based schedule applies. Miami-Dade Fire Rescue charges its own plan review and permit fees, which are not included here. See the official notice
In Doral, a building permit for a $50,000 remodel runs $1,421.75 in permit fees, a $20,000 re-roof $814.38, a $10,000 HVAC change-out $561.75, a $10,000 electrical panel upgrade or rewire $814.38, and a $10,000 whole-house repipe $814.38. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Doral Building Department Fee Schedule, effective October 1, 2026 (Res. 26-134, adopted 8/12/2026; adopted packet Exhibits E and A)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Doral values a job: Doral charges flat permit fees by type of work under its October 1, 2026 schedule, so the job value you enter does not change the permit fee.
Schedule effective October 1, 2026. Last verified: September 27, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Doral Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Doral
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Doral electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDoral Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
2 documented rates for this permit type; pick the one that matches your job.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
‡ Awaiting confirmation from the jurisdiction.
Doral's new flat fee schedule (Resolution 26-134) takes effect October 1, 2026 and applies to all current and future permit applications; until then the prior valuation-based schedule applies. Miami-Dade Fire Rescue charges its own plan review and permit fees, which are not included here. See the official notice
This fee rate is higher than in most Florida jurisdictions; it matches Doral's official schedule as published.
Estimate only. Confirm with the Doral building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Doral electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDoral Permit Fee FAQs
How Much Does a Building Permit Cost in Doral?
How Much Does a Roofing Permit Cost in Doral?
How Are Permit Fees Calculated in Doral?
What Surcharges Are Added to Permits in Doral?
Do I Need a Permit for a Small Residential Job in Doral?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.