FreeEvery fee straight from the official city and county fee schedules. No signup.

Medley, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Medley, straight from the official fee schedule, with a free permit fee calculator below.

In Medley, a $20,000 re-roof runs $490.00 in permit fees, a $10,000 HVAC change-out $154.00, a $10,000 electrical panel upgrade or rewire $367.50, and a $10,000 whole-house repipe $367.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Medley Building, Zoning and Licensing Department Fee Schedule (effective 07-06-2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Medley values a job: Permit fees are based on the applicant's estimated cost of construction; the Building Department may require supporting documentation, such as an executed construction contract, as proof of that estimate.

Schedule effective July 6, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Medley Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in Medley

All projects
3% of job value, minimum $175.00
Medley - FL Building Code Admin Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Medley - FL DBPR Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Medley - Miami-Dade County Code Compliance Surcharge
5% of the permit fee
Medley - Technology Fee (City Surcharge)
15% of the permit fee
Medley - Building Permit Extension (if applicable)
$180.00
Medley - Change of Contractor, Architect or Engineer (if applicable)
$180.00
Medley - Flood Insurance Rate Map Determination Letter (if applicable)
$75.00
Medley - Flood Plain Review (if applicable)
$125.00
Medley - Up-Front Processing Fee (credited toward permit fee)
20% of the permit fee

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Plumber in Medley

Homeowners and contractors planning a project check Medley plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Medley Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$50,000
Estimated plumbing permit fee
$367.50
Plumbing permit fee$300.00
3% of job value, minimum $175.00
Medley - FL Building Code Admin Surcharge (F.S. 468.631)$4.50
Medley - FL DBPR Surcharge (F.S. 553.721)$3.00
Medley - Miami-Dade County Code Compliance Surcharge$15.00
Medley - Technology Fee (City Surcharge)$45.00
Medley - Up-Front Processing Fee (not added to total)$60.00
Paid up front; credited against the final permit fee.
Total Estimate$367.50

Permit fees are based on the applicant's estimated cost of construction; the Building Department may require supporting documentation, such as an executed construction contract, as proof of that estimate.

Estimate only. Confirm with the Medley building department before applying.

Sponsor This Page
Be the Featured Plumber in Medley

Homeowners and contractors planning a project check Medley plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Medley Permit Fee FAQs

How Much Does a Roofing Permit Cost in Medley?

The roofing permit for a $20,000 residential re-roof runs $490.00, based on Medley's sourced fee schedule.

How Are Permit Fees Calculated in Medley?

Electrical, Plumbing, and Roofing permits scale with the value of the job; Mechanical / HVAC permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Medley?

On top of the base permit fee, the sourced schedule adds Medley - FL Building Code Admin Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), Medley - FL DBPR Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00), Medley - Miami-Dade County Code Compliance Surcharge (5% of the permit fee), Medley - Private Provider Reduction (Inspections Only) (may reduce the permit fee by 25% (printed as a reduction of the building department fees by twenty-five percent (25%), and in no case less than $175.00)), Medley - Private Provider Reduction (Plans Review and Inspections) (may reduce the permit fee by 50% (printed as a reduction of the building department fees by fifty percent (50%), and in no case less than $175.00)) and Medley - Technology Fee (City Surcharge) (15% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Medley?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Medley Building, Zoning and Licensing Department Fee Schedule (effective 07-06-2026). See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.