FreeEvery fee straight from the official city and county fee schedules. No signup.

Medley, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Medley, straight from the official fee schedule, with a free permit fee calculator below.

In Medley, a $20,000 re-roof runs $490.00 in permit fees, a $10,000 HVAC change-out $154.00, a $10,000 electrical panel upgrade or rewire $367.50, and a $10,000 whole-house repipe $367.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Medley Building, Zoning and Licensing Department Fee Schedule (effective 07-06-2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Medley permit portal, or call 305-887-6913.

How Medley values a job: Permit fees are based on the applicant's estimated cost of construction; the Building Department may require supporting documentation, such as an executed construction contract, as proof of that estimate.

Schedule effective July 6, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Medley Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Medley

Residential (1–2 family)
2% of job value, minimum $175.00‡
Commercial / 3+ units
2% of job value, minimum $225.00‡
Miami-Dade County Code Compliance Surcharge
5% of the permit fee‡
Technology Fee (City Surcharge)
15% of the permit fee
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Building Permit Extension (if applicable)
$180.00
Change of Contractor, Architect or Engineer (if applicable)
$180.00
Flood Insurance Rate Map Determination Letter (if applicable)
$75.00
Flood Plain Review (if applicable)
$125.00
Up-Front Processing Fee (paid when you apply, counts toward the permit fee)
20% of the permit fee†

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Medley

Homeowners and contractors planning a project check Medley roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Medley Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$490.00
Included in this total
Roofing Permit Fee$400.00‡
$20,000 × 2%, minimum $175.00
Miami-Dade County Code Compliance Surcharge$20.00‡
Technology Fee (City Surcharge)$60.00
State Building Code Administrators Surcharge (F.S. 468.631)$6.00
State Building Permit Surcharge (F.S. 553.721)$4.00
Total Estimate$490.00
Paid when you apply, counts toward this total
Up-Front Processing Fee$80.00
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

‡ Awaiting confirmation from the jurisdiction.

Permit fees are based on the applicant's estimated cost of construction; the Building Department may require supporting documentation, such as an executed construction contract, as proof of that estimate.

Estimate only. Confirm with the Medley building department before applying. Apply online. Phone: 305-887-6913. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Medley

Homeowners and contractors planning a project check Medley roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Medley

Medley's Building and Zoning Department takes permit applications on the Town's permit application form, and the Town's BS&A Online portal also offers online permit applications and fee payment. When you apply, you pay a non-refundable up-front processing fee of 20% of the permit fee, which is subtracted from the final permit bill. Schedule inspections through BS&A Online at least 24 hours in advance, or email building@townofmedley.com or call 305-887-6913 if the system is down. The office is at the Medley Municipal Services Facility, 7777 NW 72nd Ave, and is closed on Fridays.

Source: Medley application instructions

Apply online: Medley permit portal
Building Department Contact
Address
7777 NW 72nd Ave, Medley, FL 33166
Hours
Monday to Wednesday 7:00 am to 5:00 pm; Thursday 7:00 am to 4:30 pm; closed Fridays

Medley Permit Fee FAQs

How Much Does a Roofing Permit Cost in Medley?

The roofing permit for a $20,000 residential re-roof runs $490.00, based on Medley's sourced fee schedule.

How Are Permit Fees Calculated in Medley?

Electrical, Plumbing, and Roofing permits scale with the value of the job; Mechanical / HVAC permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Medley?

On top of the base permit fee, the sourced schedule adds Miami-Dade County Code Compliance Surcharge (5% of the permit fee), Technology Fee (City Surcharge) (15% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Medley?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Medley Building, Zoning and Licensing Department Fee Schedule (effective 07-06-2026). See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.