Miami Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Miami Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Miami Beach, a building permit for a $50,000 remodel runs $1,602.25 in permit fees, a $20,000 re-roof $646.90, a $10,000 HVAC change-out $323.75, a $10,000 electrical panel upgrade or rewire $220.75, and a $10,000 whole-house repipe $220.75. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Miami Beach FY 2027 Fee Schedule (Appendix A), effective October 1, 2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Miami Beach permit portal, or call 305-673-7610.
How Miami Beach values a job: Miami Beach charges permit fees on the construction cost approved by the building official; jobs over $5,000 need a signed Construction Cost Affidavit.
Schedule effective October 1, 2026. Last verified: September 25, 2026
This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed
Miami Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Miami Beach
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Miami Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Miami Beach charges permit fees on the construction cost approved by the building official; jobs over $5,000 need a signed Construction Cost Affidavit.
Estimate only. Confirm with the Miami Beach building department before applying. Apply online. Phone: 305-673-7610. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Miami Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Miami Beach
Apply online through Miami Beach's Civic Access portal, where you fill out the application, upload digitally signed plans, and pay fees. The application must be signed and notarized by the owner and a registered contractor (owner-builders sign alone), and jobs over $5,000 also need a Construction Cost Affidavit and a recorded Notice of Commencement. In-person help is available at the Building Department, 1700 Convention Center Drive, or the North Beach office at 962 Normandy Drive. Request, cancel, or reschedule inspections in Civic Access; inspections run Monday through Friday, 8:30 a.m. to 3:30 p.m.
Source: Miami Beach application instructions
Apply online: Miami Beach permit portal- Phone
- 305-673-7610
- Address
- 1700 Convention Center Drive, Miami Beach, FL 33139
- Hours
- Monday to Friday, 8 AM to 4 PM (closed 12 PM to 1 PM)
- Source
- Official contact page
Miami Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Miami Beach?
How Much Does a Roofing Permit Cost in Miami Beach?
How Are Permit Fees Calculated in Miami Beach?
What Surcharges Are Added to Permits in Miami Beach?
Do I Need a Permit for a Small Residential Job in Miami Beach?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.