Building Permit Fees in Miami Beach, FL (2026)
In Miami Beach, a building permit for a $50,000 remodel runs $1,602.25 in permit fees, a $20,000 re-roof $640.90, a $10,000 HVAC change-out $420.75, a $10,000 electrical panel upgrade or rewire $320.75, and a $10,000 whole-house repipe $320.75. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Miami Beach Building Department Fee Guide, effective October 1, 2025 (revised October 28, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Schedule effective October 1, 2025. Last verified: September 1, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Miami Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Miami Beach
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Miami Beach roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Miami Beach building department before applying.
Homeowners and contractors planning a project check Miami Beach roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Beach Permit Fee FAQs
How Much Is a Building Permit in Miami Beach?
How Much Is a Roofing Permit in Miami Beach?
How Are Permit Fees Calculated in Miami Beach?
What Surcharges Are Added to Permits in Miami Beach?
Do I Need a Permit for a Small Residential Job in Miami Beach?
Where Do These Fees Come From?
Compare Permit Fees Across Miami-Dade County
The same job, priced by each jurisdiction's own fee schedule. Across Miami-Dade County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $239.47 (Unincorporated Miami-Dade County) to $2,250.00 (Pinecrest).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Miami-Dade County | $239.47 | $322.88 |
| Aventura | $295.63 | $258.00 |
| Coral Gables | $1,175.00 | $470.00 |
| Cutler Bay | n/a | n/a |
| Hialeah | $1,155.00 | $450.00 |
| Homestead | $1,567.50 | $422.00 |
| Key Biscayne | $384.75 | $614.25 |
| Miami | $418.75 | $203.50 |
| Miami Beach | $1,602.25 | $640.90 |
| Miami Gardens | $1,968.75 | $341.00 |
| Miami Lakes | n/a | $441.40 |
| Palmetto Bay | n/a | $333.36 |
| Pinecrest | $2,250.00 | $685.00 |
| South Miami | $806.25 | $752.50 |
| Sweetwater | $818.65 | $413.50 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.