Building Permit Fees in Miami Gardens, FL (2026)
In Miami Gardens, a building permit for a $50,000 remodel runs $1,968.75 in permit fees, a $20,000 re-roof $341.00, a $10,000 HVAC change-out $711.00, a $10,000 electrical panel upgrade or rewire $711.00, and a $10,000 whole-house repipe $711.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Miami Gardens Building Services Division Fee Schedule, Revised 09/11/2024
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Miami Gardens values a job: Job value is the greater of the applicant-declared construction value or a per-square-foot estimate set by trade and work type in the fee schedule (for example $1.70/sf for building new construction, $1.25/sf for building alteration, $1.19/sf for electrical).
Schedule effective September 11, 2024. Last verified: September 1, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Miami Gardens Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Miami Gardens
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Miami Gardens plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Gardens Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Job value is the greater of the applicant-declared construction value or a per-square-foot estimate set by trade and work type in the fee schedule (for example $1.70/sf for building new construction, $1.25/sf for building alteration, $1.19/sf for electrical).
Estimate only. Confirm with the Miami Gardens building department before applying.
Homeowners and contractors planning a project check Miami Gardens plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Gardens Permit Fee FAQs
How Much Is a Building Permit in Miami Gardens?
How Much Is a Roofing Permit in Miami Gardens?
How Are Permit Fees Calculated in Miami Gardens?
What Surcharges Are Added to Permits in Miami Gardens?
Do I Need a Permit for a Small Residential Job in Miami Gardens?
Where Do These Fees Come From?
Compare Permit Fees Across Miami-Dade County
The same job, priced by each jurisdiction's own fee schedule. Across Miami-Dade County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $239.47 (Unincorporated Miami-Dade County) to $2,250.00 (Pinecrest).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Miami-Dade County | $239.47 | $322.88 |
| Aventura | $295.63 | $258.00 |
| Coral Gables | $1,175.00 | $470.00 |
| Cutler Bay | n/a | n/a |
| Hialeah | $1,155.00 | $450.00 |
| Homestead | $1,567.50 | $422.00 |
| Key Biscayne | $384.75 | $614.25 |
| Miami | $418.75 | $203.50 |
| Miami Beach | $1,602.25 | $640.90 |
| Miami Gardens | $1,968.75 | $341.00 |
| Miami Lakes | n/a | $441.40 |
| Palmetto Bay | n/a | $333.36 |
| Pinecrest | $2,250.00 | $685.00 |
| South Miami | $806.25 | $752.50 |
| Sweetwater | $818.65 | $413.50 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.