FreeEvery fee straight from the official city and county fee schedules. No signup.

Miami Springs, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Miami Springs, straight from the official fee schedule, with a free permit fee calculator below.

In Miami Springs, a building permit for a $50,000 remodel runs $632.50 in permit fees, a $20,000 re-roof $347.50, a $10,000 HVAC change-out $174.25, a $10,000 electrical panel upgrade or rewire $174.25, and a $10,000 whole-house repipe $300.32. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, a 3-ton system, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Miami Springs, Schedule of Charges for Building, Plumbing, Electrical, Mechanical and Other Related Permits and Fees (revised 07/01/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Miami Springs values a job: Building, electrical, plumbing, mechanical and roofing permit fees are priced primarily by physical unit (square footage, amperage, fixture count, tonnage, BTU capacity) rather than job valuation. Where a fee is charged on valuation, the schedule states that the method of determining the minimum valuation on which permits are based is established by the Building Official in conjunction with the Miami-Dade County Office of Code Compliance.

Schedule effective July 1, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Miami Springs Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Miami Springs

All projects
$15.00 per ton or fraction thereof, minimum $150.00
Boilers and Pressure Vessels
tiered rates (see fee table)
0–2 BTU (100,000)
$125.00
Over 2 BTU (100,000)
$125.00 + $25.00 per unit
Heating Units
tiered rates (see fee table)
0–5 unit (heating)
$0.00 + $31.25 per unit
Over 5 unit (heating)
$156.25 + $18.75 per unit
Miami-Dade Code Compliance Fee
0.05% of job value
State Surcharge, F.S. 468.631 (Building Code Administrators Board)
1.5% of the permit fee, minimum $2.00
State Surcharge, F.S. 553.721 (Florida Building Code)
1% of the permit fee, minimum $2.00
Technology Fee
10% of the permit fee
After Hours Inspection / Expedited Review (if applicable)
$150.00
After Hours Inspection / Expedited Review (if applicable)
$250.00
Certificate of Occupancy / Certificate of Completion (if applicable)
$250.00
Courtesy Inspection (if applicable)
$125.00
Lost Plan Fee (if applicable)
30% of the permit fee, minimum $100.00, maximum $500.00
Permit Card Replacement (if applicable)
$30.00
Permit Extension (if applicable)
$100.00
Renewal of Expired Permit (Final Inspection Only) (if applicable)
$125.00
Temporary Certificate of Occupancy / Completion (if applicable)
$125.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Miami Springs

Homeowners and contractors planning a project check Miami Springs mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Miami Springs Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Miami Springs are the same either way.

Rate type
ton
130 ton
Estimated mechanical / HVAC permit fee
$174.25
Mechanical / HVAC permit fee$45.00
3 tons × $15.00 per ton
Minimum permit fee adjustment$105.00
Minimum permit fee: $150.00
Miami-Dade Code Compliance Fee$5.00
State Surcharge, F.S. 468.631 (Building Code Administrators Board)$2.25
State Surcharge, F.S. 553.721 (Florida Building Code)$2.00
Technology Fee$15.00
Total Estimate$174.25

Assumes a $10,000.00 total job value for valuation-based surcharges.

Estimate only. Confirm with the Miami Springs building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Miami Springs

Homeowners and contractors planning a project check Miami Springs mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Miami Springs Permit Fee FAQs

How Much Does a Building Permit Cost in Miami Springs?

The building permit for a $50,000 residential remodel runs $632.50, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Miami Springs's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Miami Springs?

The roofing permit for a $20,000 residential re-roof runs $347.50, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Miami Springs's sourced fee schedule.

How Are Permit Fees Calculated in Miami Springs?

A residential building permit is tiered rates (see fee table), minimum $150.00. Electrical permits are priced per amp; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per ton; Roofing permits are priced per sq ft. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Miami Springs?

On top of the base permit fee, the sourced schedule adds State Surcharge, F.S. 468.631 (Building Code Administrators Board) (1.5% of the permit fee, minimum $2.00), State Surcharge, F.S. 553.721 (Florida Building Code) (1% of the permit fee, minimum $2.00) and Technology Fee (10% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Miami Springs?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Miami Springs, Schedule of Charges for Building, Plumbing, Electrical, Mechanical and Other Related Permits and Fees (revised 07/01/2026). See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.