FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Pinecrest, FL (2026)

In Pinecrest, a building permit for a $50,000 remodel runs $2,250.00 in permit fees, a $20,000 re-roof $685.00, a $10,000 HVAC change-out $183.05, a $10,000 electrical panel upgrade or rewire $183.05, and a $10,000 whole-house repipe $183.05. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Village of Pinecrest Building Permit Fee Schedule (Schedule A), effective 01/04/2021, adopted by Resolution 2020-69

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $136.00.

Schedule effective January 4, 2021. Last verified: September 1, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Pinecrest Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Pinecrest

All projects
$170.00 flat, minimum $136.00
Permanent Service (per 100 amps)
$136.00 per amps or fraction thereof
Miami-Dade Code Administration Fee (Sec. 8-12)
5% of the permit fee
State Surcharge, Building Code Admins/Inspectors (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
State Surcharge, Radon Gas Research (F.S. 553.721)
1% of the permit fee, minimum $2.00
Change of Contractor Fee (if applicable)
$187.00
Concurrency Review Fee (if applicable)
8% of the permit fee
Lost Permit Card Fee (if applicable)
$61.00
Permit Extension Fee (if applicable)
$135.00
Re-inspection Fee (if applicable)
$68.00
Up-Front Processing Fee (credited toward permit fee)
30% of the permit fee, minimum $136.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Pinecrest

Homeowners and contractors planning a project check Pinecrest electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Pinecrest Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated electrical permit fee
$183.05
Electrical permit fee$170.00
$170.00 flat, minimum $136.00
Miami-Dade Code Administration Fee (Sec. 8-12)$8.50
State Surcharge, Building Code Admins/Inspectors (F.S. 468.631)$2.55
State Surcharge, Radon Gas Research (F.S. 553.721)$2.00
Up-Front Processing Fee (not added to total)$136.00
Paid up front; credited against the final permit fee.
Total Estimate$183.05

Estimate only. Confirm with the Pinecrest building department before applying.

Sponsor This Page
Be the Featured Electrician in Pinecrest

Homeowners and contractors planning a project check Pinecrest electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Pinecrest Permit Fee FAQs

How Much Is a Building Permit in Pinecrest?

The building permit for a $50,000 residential remodel runs $2,250.00, including the documented surcharges and minimum fees. The estimate is built from Pinecrest's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Pinecrest?

The roofing permit for a $20,000 residential re-roof runs $685.00, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Pinecrest's sourced fee schedule.

How Are Permit Fees Calculated in Pinecrest?

A residential building permit is 4% of job value, minimum $136.00 (Source prints "$0.040 per $1.00 of estimated cost or fractional part" (4 cents per dollar), mathematically equivalent to 4.0% of estimated cost; stored as percent_of_value.). Electrical, Plumbing, and Mechanical / HVAC permits are flat fees; Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Pinecrest?

The sourced schedule sets a minimum permit fee of $136.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Pinecrest?

On top of the base permit fee, the sourced schedule adds Miami-Dade Code Administration Fee (Sec. 8-12) (5% of the permit fee), State Surcharge, Building Code Admins/Inspectors (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Surcharge, Radon Gas Research (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Pinecrest?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Village of Pinecrest Building Permit Fee Schedule (Schedule A), effective 01/04/2021, adopted by Resolution 2020-69. See the official schedule. Last verified .

Compare Permit Fees Across Miami-Dade County

The same job, priced by each jurisdiction's own fee schedule. Across Miami-Dade County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $239.47 (Unincorporated Miami-Dade County) to $2,250.00 (Pinecrest).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Miami-Dade County$239.47$322.88
Aventura$295.63$258.00
Coral Gables$1,175.00$470.00
Cutler Bayn/an/a
Hialeah$1,155.00$450.00
Homestead$1,567.50$422.00
Key Biscayne$384.75$614.25
Miami$418.75$203.50
Miami Beach$1,602.25$640.90
Miami Gardens$1,968.75$341.00
Miami Lakesn/a$441.40
Palmetto Bayn/a$333.36
Pinecrest$2,250.00$685.00
South Miami$806.25$752.50
Sweetwater$818.65$413.50

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.