South Miami, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for South Miami, straight from the official fee schedule, with a free permit fee calculator below.
In South Miami, a building permit for a remodel runs $537.50 in permit fees, a re-roof $752.50, an HVAC change-out $215.00, an electrical panel upgrade or rewire $430.00, and a whole-house repipe $430.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, 1 county-assigned inspection, and 2 county-assigned inspections. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorSouth Miami Res. No. 053-26-16467, Building Division Schedule of Fees (HB 803; permits received after July 1, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the South Miami permit portal, or call 305-663-6355.
Schedule effective July 1, 2026. Last verified: September 27, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
South Miami Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in South Miami
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check South Miami mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSouth Miami Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Estimate only. Confirm with the South Miami building department before applying. Apply online. Phone: 305-663-6355. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check South Miami mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in South Miami
South Miami's Building Division takes permit applications online through the city's eTRAKiT portal, and the permit counter is open for in-person help. The counter is in the Sylva Martin Building at 6130 Sunset Drive, 8:00 am to 3:00 pm, Monday through Friday. Permit forms are on the city's forms page, and forms handed in at the counter must be notarized originals. To book an inspection, call 305-663-6355 before 3:45 pm with your permit number, and it will be scheduled for the next business day.
Source: South Miami application instructions
Apply online: South Miami permit portal- Phone
- 305-663-6355
- Building@SoMiFL.gov
- Address
- Sylva Martin Building, 6130 Sunset Drive, South Miami, FL 33143
- Hours
- Permit service counter 8:00 am to 3:00 pm, Monday to Friday
- Source
- Official contact page
South Miami Permit Fee FAQs
How Much Does a Building Permit Cost in South Miami?
How Much Does a Roofing Permit Cost in South Miami?
How Are Permit Fees Calculated in South Miami?
What Surcharges Are Added to Permits in South Miami?
Do I Need a Permit for a Small Residential Job in South Miami?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.